|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 12/1/2025 Measured TD: 13323 ft. Vertical TD: 8314 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 12/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/27/2018 | | Proposed Top PZ Location: | Sec:16 Twp: 7N 80W | Footage: 548 FSL 1580 FEL | | Bottom Hole Location: | Sec:16 Twp: 7N 80W | Footage: 26 FNL 1654 FEL | | Proposed Depth/Form: | 13656 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 531-65 , Unit Acreage: 640, Drill Unit: E/2: 16, 21 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16.25 in., Top: 0 ft., Depth: 90 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 189, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 708, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13656 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2456, Top: 0 ft., Bottom: 13656 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/26/2019 | | Spud Date: | 8/5/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 13323 ft. | Measured PB depth: | 13259 ft. | | True Vertical TD: | 8314 ft. | True Vertical PB depth: | 8313 ft. | | Top PZ Location: | Sec:16 Twp: 7N 80W | Footage: 548 FSL 1580 FEL | | Bottom Hole Location: | Sec:16 Twp: 7N 80W | Footage: 26 FNL 1654 FEL | | Log Types: | | | Log Types: | CBL, Mud, MWD/LWD, Triple Combo | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 96 ft., Weight: 107 , Citings Type: ACTUAL | | Cement: | Sacks: 42, Top: 0 ft., Bottom: 96 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2408 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 663, Top: 0 ft., Bottom: 2408 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13308 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2070, Top: 910 ft., Bottom: 13308 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | LANCE | 2864 ft. | | | | | FOX HILLS | 3964 ft. | | | | | PIERRE | 4449 ft. | | | | | SUSSEX | 5547 ft. | | | | | SHANNON | 6120 ft. | | | | | MANCOS | 7501 ft. | | | | | NIOBRARA | 7806 ft. | | | |
Formation NBRR Formation Classification: OW Status: TA - 12/1/2025 Interval Top: 8498 ft. Interval Bottom: 13198 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/27/2019 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/12/2019 | Treatment End Date: | 3/19/2019 | | Treatment Summary: | Cemented monobore-plug and perf-frac initiation sleeve frac job contained 21 stages, all stimulated with water, acid, and prop. 504 bbls of 15% NEFE HCL Acid, 118,483 bbls of total freshwater, and 627,075 lbs of 40/70 proppant and 4,068,830 lbs of 20/40 proppant.
| | Total fluid used in treatment (bbls): | 118987 | Max pressure during treatment (psi): | 8122 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 21 | | Total acid used in treatment (bbls): | 504 | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 22796 | | Fresh water used in treatment (bbls): | 118483 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4695905 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7996 ft. | | Tubing Packer Depth: | 8450 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/13/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 855 | | BBLS_OIL | 496 | | BTU_GAS | 1400 | | CALC_BBLS_H2O | 855 | | CALC_BBLS_OIL | 496 | | CALC_GOR | 901 | | CALC_MCF_GAS | 447 | | CASING_PRESS | 630 | | GRAVITY_OIL | 37 | | MCF_GAS | 447 | | TUBING_PRESS | 1065 |
| | Perforation Data: | | Interval Top: | 8498 ft. | # Of Holes: | 672 | | Interval Bottom: | 13198 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|