| Formation Treatment |
| Treatment Type: | FRACTURE STIMULATION |
| Treatment Date: | 8/8/2019 | Treatment End Date: | 8/9/2019 |
| Treatment Summary: | SandRidge Energy recompleted a 984’ interval in the subject well. The job consisted of pumping a ten (10) stage continuous recompletion placing 210 bbls of 15% NEFe HCL, 108,730 bbls of 25lb XL gel (w/additives), 1,083,319 lb of 20/40 and 180,020 lb 40/70 proppant. |
| Total fluid used in treatment (bbls): | 108940 | Max pressure during treatment (psi): | 8295 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 |
| Type Of gas: | | Number Of staged intervals: | 10 |
| Total acid used in treatment (bbls): | 210 | Min frac gradient (psi/ft): | 1.10 |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 108730 | Disposition method For flowback: | |
| Total proppant used (lbs): | 1263339 | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | FRACTURE STIMULATION |
| Treatment Date: | 6/18/2019 | Treatment End Date: | 6/19/2019 |
| Treatment Summary: | This recompletion was a restimulation of existing perfs. The hydraulic fracturing job was one continuous treatment broken up into 14 intervals by utilizing a diversion technique between each interval, stages were diverted by proppant laden sand treatment. All stages were stimulated with water and proppant. 69,528 bbls of total freshwater and 2,022,949 lbs of 100 mesh proppant.
|
| Total fluid used in treatment (bbls): | 69528 | Max pressure during treatment (psi): | 8520 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 |
| Type Of gas: | | Number Of staged intervals: | 14 |
| Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 1.01 |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 |
| Fresh water used in treatment (bbls): | 69528 | Disposition method For flowback: | |
| Total proppant used (lbs): | 2022949 | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | FRACTURE STIMULATION |
| Treatment Date: | 8/28/2014 | Treatment End Date: | 8/31/2014 |
| Treatment Summary: | 24 stage fracture treatment with 2,296,922 lbs of Crystalline Silica Quartz; 10420 Bbls 60% HCL; 112653 Bbls Crosslink Gel. |
| Total fluid used in treatment (bbls): | 123073 | Max pressure during treatment (psi): | 7184 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 |
| Type Of gas: | | Number Of staged intervals: | 24 |
| Total acid used in treatment (bbls): | 10420 | Min frac gradient (psi/ft): | 0.68 |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 22671 |
| Fresh water used in treatment (bbls): | 112653 | Disposition method For flowback: | DISPOSAL |
| Total proppant used (lbs): | 2296922 | Green completions techniques utilized: | No |
| Reason green techniques Not utilized: PIPELINE |