Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-057-06488
Well Classification: OW Status: TA - 8/1/2025
Well Name/No:MUTUAL #4-30H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FULCRUM ENERGY OPERATING LLC - 10805
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date8/1/2025
FacilityID:300271LocationID:333288
County:JACKSON #057Location:SWSE 30 7N80W 6
Field:NORTH PARK HORIZONTAL NIOBRARA - #60120Elevation:8208 ft.
Basin:NORTH PARK BASIN  
Planned Location:240FSL  1995 FELLat/Long: 40.541767 / -106.414411Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.541767 / -106.414411Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #01
Start Date: 11/11/2014
End Date: 11/18/2014
Reported: 12/30/2014
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 8/1/2025             Measured TD: 12120 ft.    Vertical TD: 6937 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 8/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/18/2015
Proposed Top PZ Location:Sec:31 Twp: 7N 80W Footage: 623 FNL  2451 FEL
Bottom Hole Location:Sec:31 Twp: 7N 80W Footage: 568 FSL  623 FWL
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 531-1 , Unit Acreage: 622, Drill Unit: ALL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1430 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1010, Top: 0 ft., Bottom: 1430 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 11060 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1900, Top: 0 ft., Bottom: 12120 ft.
Casing:String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: , Depth: 6750 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 560, Top: 6750 ft., Bottom:
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1000 ft., Depth: 8000 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/27/2014
Spud Date:8/21/2014Spud Date Is:ACTUAL
Measured TD:12120 ft.Measured PB depth:11060 ft.
True Vertical TD:6937 ft.True Vertical PB depth:7015 ft.
Top PZ Location:Sec:31 Twp: 7N 80WFootage: 623 FNL  2451 FEL
Bottom Hole Location:Sec:31 Twp: 7N 80WFootage: 568 FSL  623 FWL
Log Types:MWD Gamma Ray, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1430 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 0 ft., Bottom: 1430 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 11060 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1900, Top: 0 ft., Bottom: 11060 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
TERTIARY0 ft.NN
SUDDUTH COAL2264 ft.NN
SHANNON5344 ft.NN
NIOBRARA6712 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  TA - 8/1/2025                  Interval Top: 7640 ft.    Interval Bottom: 10984 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/22/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/10/2014Treatment End Date:11/18/2014
Treatment Summary:Twenty four stage horizontal well stimulation with 4,591,685 lbs of 20/40 sand; 845 barrells of 15%HCL; 106,015 barrels of crosslink gel.
Total fluid used in treatment (bbls):106860Max pressure during treatment (psi):7803
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):845Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):15048
Fresh water used in treatment (bbls):106015Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4591685Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:6911 ft.
Tubing Packer Depth:6908 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/23/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 668
BBLS_OIL 301
BTU_GAS 1450
CALC_BBLS_H2O 668
CALC_BBLS_OIL 301
CALC_GOR 678
CALC_MCF_GAS 204
CASING_PRESS 850
GRAVITY_OIL 37
MCF_GAS 204
TUBING_PRESS 771
Perforation Data:
Interval Top:7640 ft.# Of Holes:1152
Interval Bottom:10984 ft.Hole Size:0.375 in.

Sidetrack #01             Wellbore Classification:              Status: AL - 8/16/2022             Measured TD:

 Wellbore Data for Sidetrack #01Wellbore Classification:         AL - 8/16/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/18/2015
Proposed Top PZ Location:Sec:31 Twp: 7N 80W Footage: 600 FNL  2562 FEL
Bottom Hole Location:Sec:31 Twp: 7N 80W Footage: 620 FSL  620 FWL
Proposed Depth/Form:12518 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 531-1 , Unit Acreage: 622, Drill Unit: ALL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 405, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7647 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 530, Top: 800 ft., Bottom: 7647 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 6750 ft., Depth: 12518 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 575, Top: 6750 ft., Bottom: 12518 ft.

Wellbore Completed
Completion Date:N/A
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1430 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 0 ft., Bottom: 1430 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 11060 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1900, Top: , Bottom: 11060 ft., Determination Method:
  No formation data to display.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
07/01/2025
Defined Inactive (TA)YLast Production
07/16/2025
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No