|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/11/2019 Measured TD: 10177 ft. Vertical TD: 9658 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/11/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/10/2020 | | Proposed Top PZ Location: | Sec:3 Twp: 6S 97W | Footage: 1076 FNL 1323 FWL | | Bottom Hole Location: | Sec:3 Twp: 6S 97W | Footage: 1076 FNL 1323 FWL | | Proposed Depth/Form: | 10265 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 510-70 , Unit Acreage: 871, Drill Unit: Sec 3 All | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-70 , Unit Acreage: 871, Drill Unit: Sec 3 All | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.44 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2530 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1237, Top: 0 ft., Bottom: 2530 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10265 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1585, Top: 2030 ft., Bottom: 10265 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/28/2019 | | Spud Date: | 7/23/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 10177 ft. | Measured PB depth: | 10116 ft. | | True Vertical TD: | 9658 ft. | True Vertical PB depth: | 9599 ft. | | Top PZ Location: | Sec:3 Twp: 6S 97W | Footage: 1082 FNL 1325 FWL | | Bottom Hole Location: | Sec:3 Twp: 6S 97W | Footage: 1058 FNL 1312 FWL | | Log Types: | Pulsed Neutron, GR, CBL, Temp, Mud (Triple Combo in API 045-23987) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.9 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2599 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1130, Top: 368 ft., Bottom: 2599 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10159 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1672, Top: 2400 ft., Bottom: 10159 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 368 ft., Bottom: 368 ft., Sacks: 365, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 3305 ft. | 5113 ft. | N | N | | WASATCH G | 5113 ft. | 5785 ft. | N | N | | FORT UNION | 5785 ft. | 7074 ft. | N | N | | OHIO CREEK | 7074 ft. | 7520 ft. | N | N | | WILLIAMS FORK | 7520 ft. | 9583 ft. | N | N | | CAMEO | 9583 ft. | 10027 ft. | N | N | | ROLLINS | 10027 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 12/11/2019 Interval Top: 7924 ft. Interval Bottom: 9996 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/2/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/1/2019 | Treatment End Date: | 11/18/2019 | | Treatment Summary: | 74,000 bbls water; no proppant | | Total fluid used in treatment (bbls): | 74000 | Max pressure during treatment (psi): | 6498 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.49 | | Recycled water used in treatment (bbls): | 71828 | Total flowback volume recovered (bbls): | 50067 | | Fresh water used in treatment (bbls): | 2172 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9471 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/11/2019 | Test Method: | Flowing | | Hours Tested: | 1 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1039 | | CALC_MCF_GAS | 1042 | | CASING_PRESS | 2079 | | MCF_GAS | 43 | | TUBING_PRESS | 1383 |
| | Perforation Data: | | Interval Top: | 7924 ft. | # Of Holes: | 234 | | Interval Bottom: | 9996 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 111 |
| Total Gas Produced (MCF) | 63397 |
| GOR | 571144 |
| GOR Determination | MCFE |
| Average BOE per Day | 30.261 |
| Average MCFE per Day | 175.522 |
| Federal Financial Assurance | i | Y |
|
|