Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23873
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:NPR #11C-9-596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:454326LocationID:335699
County:GARFIELD #045Location:SENW 9 5S96W 6
Field:WILDCAT - #99999Elevation:7645 ft.
Basin:PICEANCE BASIN  
Planned Location:1690FNL  2472 FWLLat/Long: 39.632175 / -108.174758Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.632175 / -108.174756Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/4/2019
End Date: 5/6/2019
Reported: 7/25/2019
Days to report: 80
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 10185 ft.    Vertical TD: 10016 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/13/2020
Proposed Top PZ Location:Sec:9 Twp: 5S 96W Footage: 771 FNL  1318 FWL
Bottom Hole Location:Sec:9 Twp: 5S 96W Footage: 833 FNL  1318 FWL
Proposed Depth/Form:10181 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 826, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10185 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 950, Top: 4743 ft., Bottom: 10185 ft.

Wellbore Completed
Completion Date:1/20/2019
Spud Date:1/10/2019Spud Date Is:ACTUAL
Measured TD:10185 ft.Measured PB depth:10125 ft.
True Vertical TD:10016 ft.True Vertical PB depth:9957 ft.
Top PZ Location:Sec:9 Twp: 5S 96WFootage: 766 FNL  1488 FWL
Bottom Hole Location:Sec:9 Twp: 5S 96WFootage: 836 FNL  1327 FWL
Log Types:CBL, Pulsed Neutron, Triple Combo.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2465 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 745, Top: 0 ft., Bottom: 2465 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10173 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 965, Top: 4300 ft., Bottom: 10173 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH2841 ft.NN
WASATCH G4476 ft.NN
FORT UNION4933 ft.NN
OHIO CREEK6665 ft.NN
WILLIAMS FORK6958 ft.NN
CAMEO9366 ft.NN
ROLLINS10004 ft.NN

Formation WF-OC                   Formation Classification:  GW                   Status:  PR - 7/1/2024                  Interval Top: 6686 ft.    Interval Bottom: 9067 ft.

 Completed Information for Formation WILLIAMS FORK-OHIO CREEK
1st Production Date:5/24/2019Choke Size: 
Formation Name:WILLIAMS FORK-OHIO CREEKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/4/2019Treatment End Date:5/6/2019
Treatment Summary:10-stage plug-and-perf completion; 80001 total bbls fluid pumped: 2970 bbls fresh water (slickwater), 76912 bbls recycled water (slickwater), and 119 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):80001Max pressure during treatment (psi):7772
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.41
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):0.73
Recycled water used in treatment (bbls):76912Total flowback volume recovered (bbls):29164
Fresh water used in treatment (bbls):2970Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8481 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/24/2019Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1872
BTU_GAS 1060
CALC_BBLS_H2O 1872
CALC_MCF_GAS 297
CASING_PRESS 3000
MCF_GAS 297
TUBING_PRESS 350
Perforation Data:
Interval Top:6686 ft.# Of Holes:270
Interval Bottom:9067 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)38955
GOR
GOR DeterminationMCFE
Average BOE per Day18.415
Average MCFE per Day106.797

 Federal Financial Assurance  i 

 Tribal Well  i No