Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23770
Well Classification: GW Status: PR - 9/1/2025
Well Name/No:NPR #24D-10-596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:452669LocationID:335676
County:GARFIELD #045Location:NESW 10 5S96W 6
Field:GRAND VALLEY - #31290Elevation:6708 ft.
Basin:PICEANCE BASIN  
Planned Location:1869FSL  2535 FWLLat/Long: 39.627458 / -108.155783Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.627458 / -108.155784Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/11/2018
End Date: 12/20/2018
Reported: 7/29/2019
Days to report: 221
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2025             Measured TD: 9804 ft.    Vertical TD: 9545 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/19/2019
Proposed Top PZ Location:Sec:10 Twp: 5S 96W Footage: 1169 FSL  1311 FEL
Bottom Hole Location:Sec:10 Twp: 5S 96W Footage: 1169 FSL  1311 FEL
Proposed Depth/Form:9805 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 787, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9805 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 988, Top: 4250 ft., Bottom: 9805 ft.

Wellbore Completed
Completion Date:5/5/2018
Spud Date:4/26/2018Spud Date Is:ACTUAL
Measured TD:9804 ft.Measured PB depth:9714 ft.
True Vertical TD:9545 ft.True Vertical PB depth:9455 ft.
Top PZ Location:Sec:10 Twp: 5S 96WFootage: 1244 FSL  1185 FEL
Bottom Hole Location:Sec:10 Twp: 5S 96WFootage: 1172 FSL  1348 FEL
Log Types:CBL, Pulsed Neutron, (Triple Combo on 045-23777).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2394 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 528, Top: 0 ft., Bottom: 2400 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9760 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 6140 ft., Bottom: 9804 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH G3846 ft.NN
FORT UNION4305 ft.NN
OHIO CREEK6167 ft.NN
WILLIAMS FORK6527 ft.NN
CAMEO8897 ft.NN
ROLLINS9649 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2025                  Interval Top: 6549 ft.    Interval Bottom: 9613 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/27/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/11/2018Treatment End Date:12/20/2018
Treatment Summary:13-stage plug-and-perf completion; 234000 total bbls fluid pumped: 233845 bbls recycled water (slickwater) and 155 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):234000Max pressure during treatment (psi):8459
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):155Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):233845Total flowback volume recovered (bbls):98935
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8832 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/27/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1879
BTU_GAS 1080
CALC_BBLS_H2O 1879
CALC_MCF_GAS 72
CASING_PRESS 1342
MCF_GAS 72
Perforation Data:
Interval Top:6549 ft.# Of Holes:351
Interval Bottom:9613 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)380
Total Gas Produced (MCF)66916
GOR176094
GOR DeterminationMCFE
Average BOE per Day32.739
Average MCFE per Day189.890

 Federal Financial Assurance  i 

 Tribal Well  i No