Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23757
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:NPR #12A-10-596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:452654LocationID:335676
County:GARFIELD #045Location:NESW 10 5S96W 6
Field:GRAND VALLEY - #31290Elevation:6708 ft.
Basin:PICEANCE BASIN  
Planned Location:1915FSL  2467 FWLLat/Long: 39.627586 / -108.156025Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.627587 / -108.156026Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/27/2018
End Date: 11/3/2018
Reported: 7/26/2019
Days to report: 265
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 10025 ft.    Vertical TD: 9473 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/19/2019
Proposed Top PZ Location:Sec:10 Twp: 5S 96W Footage: 1235 FNL  1332 FWL
Bottom Hole Location:Sec:10 Twp: 5S 96W Footage: 1235 FNL  1332 FWL
Proposed Depth/Form:9973 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 787, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9973 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 1039, Top: 4148 ft., Bottom: 9973 ft.

Wellbore Completed
Completion Date:8/17/2018
Spud Date:8/10/2018Spud Date Is:ACTUAL
Measured TD:10025 ft.Measured PB depth:9966 ft.
True Vertical TD:9473 ft.True Vertical PB depth:9414 ft.
Top PZ Location:Sec:10 Twp: 5S 96WFootage: 1225 FNL  1485 FWL
Bottom Hole Location:Sec:10 Twp: 5S 96WFootage: 1225 FNL  1311 FWL
Log Types:CBL, PNR, (Triple Combo on 045-23777).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2383 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 498, Top: 0 ft., Bottom: 2399 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10008 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 971, Top: 4350 ft., Bottom: 10025 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH G4173 ft.NN
FORT UNION4605 ft.NN
OHIO CREEK6448 ft.NN
WILLIAMS FORK6760 ft.NN
CAMEO9183 ft.NN
ROLLINS9939 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2024                  Interval Top: 6843 ft.    Interval Bottom: 9874 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/22/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/27/2018Treatment End Date:11/3/2018
Treatment Summary:13-stage plug-and-perf completion; 233998 total bbls fluid pumped: 233843 bbls recycled water (slickwater) and 155 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):233998Max pressure during treatment (psi):8295
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.41
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):155Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):233843Total flowback volume recovered (bbls):101622
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/22/2018Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2513
BTU_GAS 1028
CALC_BBLS_H2O 2513
CALC_MCF_GAS 92
CASING_PRESS 1596
MCF_GAS 92
Perforation Data:
Interval Top:6843 ft.# Of Holes:351
Interval Bottom:9874 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)216
Total Gas Produced (MCF)39795
GOR184236
GOR DeterminationMCFE
Average BOE per Day19.388
Average MCFE per Day112.451

 Federal Financial Assurance  i 

 Tribal Well  i No