Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23705
Well Classification: GW Status: PR - 10/16/2018
Well Name/No:FEDERAL #PA 334-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC73094
Facility Status:PRStatus Date10/16/2018
FacilityID:452358LocationID:335330
County:GARFIELD #045Location:NESW 26 6S95W 6
Field:PARACHUTE - #67350Elevation:5637 ft.
Basin:PICEANCE BASIN  
Planned Location:2117FSL  2416 FWLLat/Long: 39.494328 / -107.966882Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.494329 / -107.966882Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/20/2018
End Date: 9/26/2018
Reported: 10/8/2018
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/16/2018             Measured TD: 8484 ft.    Vertical TD: 8249 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/16/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/26/2019
Proposed Top PZ Location:Sec:26 Twp: 6S 95W Footage: 857 FSL  2052 FEL
Bottom Hole Location:Sec:26 Twp: 6S 95W Footage: 857 FSL  2052 FEL
Proposed Depth/Form:8501 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-79 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 266, Top: 0 ft., Bottom: 1100 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8501 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1149, Top: 2225 ft., Bottom: 8501 ft.

Wellbore Completed
Completion Date:8/20/2018
Spud Date:8/15/2018Spud Date Is:ACTUAL
Measured TD:8484 ft.Measured PB depth:8441 ft.
True Vertical TD:8249 ft.True Vertical PB depth:8206 ft.
Top PZ Location:Sec:26 Twp: 6S 95WFootage: 899 FSL  2050 FEL
Bottom Hole Location:Sec:26 Twp: 6S 95WFootage: 841 FSL  2052 FEL
Log Types:CBL, PULSED NEUTRON (TRIPLE COMBO IN 045-23709)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 104 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 174, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1128 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8474 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1835, Top: 1247 ft., Bottom: 8484 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2508 ft.
WILLIAMS FORK4787 ft.
MESAVERDE4879 ft.
OHIO CREEK4879 ft.
CAMEO7973 ft.
ROLLINS8367 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/16/2018                Interval Top: 5828 ft.    Interval Bottom: 8299 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/16/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/20/2018Treatment End Date:9/26/2018
Treatment Summary:68157 bbls of slickwater; 1234424 100/Mesh; 1727 gals of biocide
Total fluid used in treatment (bbls):68198Max pressure during treatment (psi):7678
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.77
Recycled water used in treatment (bbls):68157Total flowback volume recovered (bbls):22949
Fresh water used in treatment (bbls):41Disposition method For flowback:RECYCLE
Total proppant used (lbs):1234424Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8052 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/16/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1058
CALC_MCF_GAS 3303
CASING_PRESS 1530
MCF_GAS 3303
TUBING_PRESS 1190
Perforation Data:
Interval Top:5828 ft.# Of Holes:264
Interval Bottom:8299 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)76
Total Gas Produced (MCF)32445
GOR426907
GOR DeterminationMCFE
Average BOE per Day15.531
Average MCFE per Day90.077

 Federal Financial Assurance  i Y

 Tribal Well  i No