Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23704
Well Classification: GW Status: PR - 9/3/2018
Well Name/No:FEDERAL #PA 11-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC062161
Facility Status:PRStatus Date9/3/2018
FacilityID:452357LocationID:335330
County:GARFIELD #045Location:NESW 26 6S95W 6
Field:PARACHUTE - #67350Elevation:5637 ft.
Basin:PICEANCE BASIN  
Planned Location:2129FSL  2453 FWLLat/Long: 39.494360 / -107.966751Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.494360 / -107.966751Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/1/2018
End Date: 8/9/2018
Reported: 8/21/2018
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/3/2018             Measured TD: 9565 ft.    Vertical TD: 8489 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/3/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/26/2019
Proposed Top PZ Location:Sec:26 Twp: 6S 95W Footage: 167 FNL  730 FWL
Bottom Hole Location:Sec:26 Twp: 6S 95W Footage: 167 FNL  730 FWL
Proposed Depth/Form:9595 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: W2 Sec 26
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 266, Top: 0 ft., Bottom: 1100 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9595 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1213, Top: 2954 ft., Bottom: 9595 ft.

Wellbore Completed
Completion Date:5/31/2018
Spud Date:5/26/2018Spud Date Is:ACTUAL
Measured TD:9565 ft.Measured PB depth:9522 ft.
True Vertical TD:8489 ft.True Vertical PB depth:8446 ft.
Top PZ Location:Sec:26 Twp: 6S 95WFootage: 264 FNL  803 FWL
Bottom Hole Location:Sec:26 Twp: 6S 95WFootage: 146 FNL  730 FWL
Log Types:CBL, PULSED NEUTRON (TRIPLE COMBO IN API 045-23709)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 104 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 174, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1124 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9555 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1940, Top: 1958 ft., Bottom: 9565 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G5203 ft.
WILLIAMS FORK5743 ft.
MESAVERDE5800 ft.
OHIO CREEK5800 ft.
CAMEO9027 ft.
ROLLINS9356 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/3/2018                  Interval Top: 6961 ft.    Interval Bottom: 9296 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/3/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/1/2018Treatment End Date:8/9/2018
Treatment Summary:63638 bbls of slickwater; 1767266 100/Mesh; 2372 gals of biocide
Total fluid used in treatment (bbls):63694Max pressure during treatment (psi):8591
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):63638Total flowback volume recovered (bbls):32914
Fresh water used in treatment (bbls):56Disposition method For flowback:RECYCLE
Total proppant used (lbs):1767266Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9076 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1118
CALC_MCF_GAS 2009
CASING_PRESS 2124
MCF_GAS 2009
TUBING_PRESS 1640
Perforation Data:
Interval Top:6961 ft.# Of Holes:264
Interval Bottom:9296 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)201
Total Gas Produced (MCF)73027
GOR363318
GOR DeterminationMCFE
Average BOE per Day35.067
Average MCFE per Day203.399

 Federal Financial Assurance  i Y

 Tribal Well  i No