Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23504
Well Classification: GW Status: PR - 12/11/2017
Well Name/No:GM #313-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date12/11/2017
FacilityID:450236LocationID:334816
County:GARFIELD #045Location:LOT 7 5 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5977 ft.
Basin:PICEANCE BASIN  
Planned Location:753FSL  892 FELLat/Long: 39.461100 / -108.125506Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.461098 / -108.125506Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/18/2017
End Date: 11/21/2017
Reported: 12/12/2017
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/11/2017             Measured TD: 7288 ft.    Vertical TD: 6681 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/11/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/4/2019
Proposed Top PZ Location:Sec:4 Twp: 7S 96W Footage: 2426 FSL  797 FWL
Bottom Hole Location:Sec:4 Twp: 7S 96W Footage: 2426 FSL  797 FWL
Proposed Depth/Form:7318 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 85 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 142, Top: 0 ft., Bottom: 85 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 244, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7318 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 596, Top: 3968 ft., Bottom: 7318 ft.

Wellbore Completed
Completion Date:8/31/2017
Spud Date:8/27/2017Spud Date Is:ACTUAL
Measured TD:7288 ft.Measured PB depth:7245 ft.
True Vertical TD:6681 ft.True Vertical PB depth:6638 ft.
Top PZ Location:Sec:4 Twp: 7S 96WFootage: 2399 FSL  767 FWL
Bottom Hole Location:Sec:4 Twp: 7S 96WFootage: 2405 FSL  811 FWL
Log Types:CBL/PULSED NEUTRON/(TRIPLE COMBO IN 045-22668)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 109 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 182, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1024 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1024 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7288 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 2550 ft., Bottom: 7288 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2338 ft.
MESAVERDE4137 ft.
OHIO CREEK4137 ft.
WILLIAMS FORK4377 ft.
CAMEO6817 ft.
ROLLINS7163 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/11/2017                Interval Top: 5199 ft.    Interval Bottom: 6876 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/11/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/18/2017Treatment End Date:11/21/2017
Treatment Summary:54062 bbls of slickwater; No Proppant; 1160 gals of biocide
Total fluid used in treatment (bbls):54090Max pressure during treatment (psi):5206
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):54062Total flowback volume recovered (bbls):20935
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6909 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1086
CALC_MCF_GAS 2762
CASING_PRESS 1530
MCF_GAS 2762
TUBING_PRESS 1480
Perforation Data:
Interval Top:5199 ft.# Of Holes:192
Interval Bottom:6876 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)89
Total Gas Produced (MCF)52783
GOR593067
GOR DeterminationMCFE
Average BOE per Day25.180
Average MCFE per Day146.053

 Federal Financial Assurance  i Y

 Tribal Well  i No