Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23282
Well Classification: GW Status: PR - 9/20/2017
Well Name/No:Puckett #41A-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/20/2017
FacilityID:447169LocationID:335512
County:GARFIELD #045Location:NWNE 23 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8535 ft.
Basin:PICEANCE BASIN  
Planned Location:264FNL  1820 FELLat/Long: 39.515003 / -108.184514Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.515003 / -108.184514Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/9/2017
End Date: 9/12/2017
Reported: 4/2/2018
Days to report: 202
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/20/2017             Measured TD: 9347 ft.    Vertical TD: 9235 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/20/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/4/2018
Proposed Top PZ Location:Sec:23 Twp: 6S 97W Footage: 151 FNL  887 FEL
Bottom Hole Location:Sec:23 Twp: 6S 97W Footage: 151 FNL  887 FEL
Proposed Depth/Form:9313 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8# , Citings Type: PLANNED
Cement:Sacks: 623, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 829, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9349 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 840, Top: 4518 ft., Bottom: 9349 ft.

Wellbore Completed
Completion Date:12/23/2016
Spud Date:12/18/2016Spud Date Is:ACTUAL
Measured TD:9347 ft.Measured PB depth:9310 ft.
True Vertical TD:9235 ft.True Vertical PB depth:9198 ft.
Top PZ Location:Sec:23 Twp: 6S 97WFootage: 135 FNL  737 FEL
Bottom Hole Location:Sec:23 Twp: 6S 97WFootage: 243 FNL  891 FEL
Log Types:CBL, PNL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2526 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 866, Top: 0 ft., Bottom: 2526 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9345 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 941, Top: 4841 ft., Bottom: 9345 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.2743 ft.NN
WASATCH2743 ft.4710 ft.NN
WASATCH G4710 ft.5027 ft.NN
FORT UNION5027 ft.6304 ft.NN
OHIO CREEK6304 ft.6551 ft.NN
WILLIAMS FORK6551 ft.8802 ft.NN
CAMEO8802 ft.9248 ft.NN
ROLLINS9248 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/20/2017                 Interval Top: 7384 ft.    Interval Bottom: 9197 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/20/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/8/2017Treatment End Date:9/13/2017
Treatment Summary:Frac'd with 56,000 bbls slickwater and 169 bbls 7.5% HCl acid.
Total fluid used in treatment (bbls):56000Max pressure during treatment (psi):8403
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):169Min frac gradient (psi/ft):0.47
Recycled water used in treatment (bbls):56831Total flowback volume recovered (bbls):25904
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8922 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/20/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1507
BTU_GAS 1056
CALC_BBLS_H2O 1507
CALC_MCF_GAS 1287
CASING_PRESS 1550
MCF_GAS 1287
TUBING_PRESS 600
Perforation Data:
Interval Top:7384 ft.# Of Holes:189
Interval Bottom:9197 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)91
Total Gas Produced (MCF)47022
GOR516725
GOR DeterminationMCFE
Average BOE per Day22.479
Average MCFE per Day130.380

 Federal Financial Assurance  i 

 Tribal Well  i No