Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23236
Well Classification: GW Status: PR - 9/19/2017
Well Name/No:Chevron #11C-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/19/2017
FacilityID:446089LocationID:335781
County:GARFIELD #045Location:Lot 1 17 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5586 ft.
Basin:PICEANCE BASIN  
Planned Location:1261FNL  2033 FELLat/Long: 39.528244 / -108.129633Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.528244 / -108.129633Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/19/2017             Measured TD: 7693 ft.    Vertical TD: 7091 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/19/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/9/2018
Proposed Top PZ Location:Sec:17 Twp: 6S 96W Footage: 917 FNL  806 FWL
Bottom Hole Location:Sec:17 Twp: 6S 96W Footage: 917 FNL  806 FWL
Proposed Depth/Form:7761 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 950 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 275, Top: 0 ft., Bottom: 950 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7761 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 880, Top: 3100 ft., Bottom: 7761 ft.

Wellbore Completed
Completion Date:6/13/2017
Spud Date:6/9/2017Spud Date Is:ACTUAL
Measured TD:7693 ft.Measured PB depth:7626 ft.
True Vertical TD:7091 ft.True Vertical PB depth:7025 ft.
Top PZ Location:Sec:17 Twp: 6S 96WFootage: 868 FNL  1015 FWL
Bottom Hole Location:Sec:17 Twp: 6S 96WFootage: 926 FNL  868 FWL
Log Types:CBL, PNL, (TRIPLE-COMBO ON 045-23237).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1004 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 242, Top: 0 ft., Bottom: 1004 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7642 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 712, Top: 3157 ft., Bottom: 7642 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
ALLUVIUM0 ft.NN
WASATCH791 ft.NN
WASATCH G2711 ft.NN
FORT UNION3058 ft.NN
OHIO CREEK4441 ft.NN
WILLIAMS FORK4696 ft.NN
CAMEO7032 ft.NN
ROLLINS7536 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/19/2017                 Interval Top: 5420 ft.    Interval Bottom: 7452 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/19/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2017Treatment End Date:9/18/2017
Treatment Summary:Frac'd with 64,000 bbls slickwater.
Total fluid used in treatment (bbls):64000Max pressure during treatment (psi):7228
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):14720Total flowback volume recovered (bbls):27023
Fresh water used in treatment (bbls):49280Disposition method For flowback:DISPOSAL
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7135 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/19/2017Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3665
BTU_GAS 1067
CALC_BBLS_H2O 3665
CALC_MCF_GAS 365
CASING_PRESS 875
MCF_GAS 362
Perforation Data:
Interval Top:5420 ft.# Of Holes:222
Interval Bottom:7452 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)71
Total Gas Produced (MCF)46153
GOR650042
GOR DeterminationMCFE
Average BOE per Day22.019
Average MCFE per Day127.720

 Federal Financial Assurance  i Y

 Tribal Well  i No