Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22824
Well Classification: GW Status: PR - 4/1/2024
Well Name/No:YATER #42A-18-07-95
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2024
FacilityID:441263LocationID:159652
County:GARFIELD #045Location:NWSW 17 7S95W 6
Field:PARACHUTE - #67350Elevation:5513 ft.
Basin:PICEANCE BASIN  
Planned Location:1817FSL  1128 FWLLat/Long: 39.435434 / -108.026404Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.435434 / -108.026404Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/5/2015
End Date: 9/17/2015
Reported: 10/8/2015
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2024             Measured TD: 7381 ft.    Vertical TD: 6609 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/26/2017
Proposed Top PZ Location:Sec:18 Twp: 7S 95W Footage: 1526 FNL  660 FEL
Bottom Hole Location:Sec:18 Twp: 7S 95W Footage: 1526 FNL  660 FEL
Proposed Depth/Form:7489 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-71 , Unit Acreage: 320, Drill Unit: Sec 18 N/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: PLANNED
Cement:Sacks: 111, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1870 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 386, Top: 0 ft., Bottom: 1870 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7489 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 485, Top: , Bottom: 7489 ft.

Wellbore Completed
Completion Date:8/9/2015
Spud Date:7/30/2015Spud Date Is:ACTUAL
Measured TD:7381 ft.Measured PB depth:7320 ft.
True Vertical TD:6609 ft.True Vertical PB depth:6548 ft.
Top PZ Location:Sec:18 Twp: 7S 95WFootage: 1514 FNL  699 FEL
Bottom Hole Location:Sec:18 Twp: 7S 95WFootage: 1514 FNL  699 FEL
Log Types:CBL, MUD, PULSED NEUTRON. NO OPEN HOLE LOGS WERE RUN ON THIS WELL. IN ACCORDANCE WITH RULE 317.p.,OPEN HOLE LOGS WERE RUN ON THE YATER 12D-17-07-95 (API # 05-045-22761).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 77 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 77 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1862 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 392, Top: 0 ft., Bottom: 1862 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7366 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 965, Top: 1440 ft., Bottom: 7366 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK4046 ft.NN
CAMEO6682 ft.NN
ROLLINS7180 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2024                  Interval Top: 4296 ft.    Interval Bottom: 7130 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/21/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2015Treatment End Date:9/18/2015
Treatment Summary:Frac'd with 151,139 bbls 2% slickwater and no proppant. Frac pair with YATER 41D-18-07-95 (05-045-22828)
Total fluid used in treatment (bbls):151139Max pressure during treatment (psi):7509
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):151139Total flowback volume recovered (bbls):34877
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5722 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/8/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1275
BTU_GAS 1048
CALC_BBLS_H2O 1275
CALC_MCF_GAS 3319
CASING_PRESS 600
MCF_GAS 3319
TUBING_PRESS 1350
Perforation Data:
Interval Top:4296 ft.# Of Holes:540
Interval Bottom:7130 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)5241
GOR
GOR DeterminationMCFE
Average BOE per Day2.477
Average MCFE per Day14.374

 Federal Financial Assurance  i 

 Tribal Well  i No