Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22793
Well Classification: GW Status: PR - 5/12/2016
Well Name/No:Federal RU #413-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC41916
Facility Status:PRStatus Date5/12/2016
FacilityID:159716LocationID:159692
County:GARFIELD #045Location:NENW 8 7S93W 6
Field:RULISON - #75400Elevation:7738 ft.
Basin:PICEANCE BASIN  
Planned Location:633FNL  1901 FWLLat/Long: 39.465472 / -107.800895Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465473 / -107.800894Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/21/2016
End Date: 5/4/2016
Reported: 5/19/2016
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/12/2016             Measured TD: 10273 ft.    Vertical TD: 10025 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/12/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/15/2017
Proposed Top PZ Location:Sec:5 Twp: 7S 93W Footage: 774 FSL  978 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93W Footage: 774 FSL  978 FWL
Proposed Depth/Form:10289 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: 403, Drill Unit: Sec 5 ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 315, Top: 0 ft., Bottom: 1200 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10223 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 917, Top: 6513 ft., Bottom: 10223 ft.

Wellbore Completed
Completion Date:12/12/2015
Spud Date:12/5/2015Spud Date Is:ACTUAL
Measured TD:10273 ft.Measured PB depth:10233 ft.
True Vertical TD:10025 ft.True Vertical PB depth:9985 ft.
Top PZ Location:Sec:5 Twp: 7S 93WFootage: 807 FSL  992 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93WFootage: 758 FSL  984 FWL
Log Types:RPM/MUD/CBL/Triple Combo on 045-22773
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1267 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1267 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10263 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 5122 ft., Bottom: 10263 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3834 ft.
MESAVERDE6445 ft.
WILLIAMS FORK6445 ft.
CAMEO9295 ft.
ROLLINS10101 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/12/2016                 Interval Top: 7498 ft.    Interval Bottom: 10020 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/26/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/26/2016Treatment End Date:5/12/2016
Treatment Summary:500 Gals 7.5% HCL; 97143 BBLs Slickwater; 1787353 100/mesh; 94850 40/70 Sand; (summary)
Total fluid used in treatment (bbls):97155Max pressure during treatment (psi):5967
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):97143Total flowback volume recovered (bbls):23477
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1882203Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9766 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CALC_MCF_GAS 2087
CASING_PRESS 2500
MCF_GAS 2087
TUBING_PRESS 1650
Perforation Data:
Interval Top:7498 ft.# Of Holes:264
Interval Bottom:10020 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)92
Total Gas Produced (MCF)70419
GOR765423
GOR DeterminationMCFE
Average BOE per Day33.520
Average MCFE per Day194.422

 Federal Financial Assurance  i Y

 Tribal Well  i No