Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22684
Well Classification: GW Status: SI - 6/1/2024
Well Name/No:Federal GM #442-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:SIStatus Date6/1/2024
FacilityID:440611LocationID:322536
County:GARFIELD #045Location:SENW 10 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6148 ft.
Basin:PICEANCE BASIN  
Planned Location:2129FNL  1858 FWLLat/Long: 39.452935 / -108.096791Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.452935 / -108.096791Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/10/2017
End Date: 7/15/2017
Reported: 8/31/2017
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 6/1/2024             Measured TD: 7224 ft.    Vertical TD: 6726 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 6/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/11/2018
Proposed Top PZ Location:Sec:9 Twp: 7S 96W Footage: 2302 FNL  181 FEL
Bottom Hole Location:Sec:9 Twp: 7S 96W Footage: 2302 FNL  181 FEL
Proposed Depth/Form:7252 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1050 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 255, Top: 0 ft., Bottom: 1050 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7252 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 598, Top: 3893 ft., Bottom: 7252 ft.

Wellbore Completed
Completion Date:5/25/2017
Spud Date:5/21/2017Spud Date Is:ACTUAL
Measured TD:7224 ft.Measured PB depth:7115 ft.
True Vertical TD:6726 ft.True Vertical PB depth:6617 ft.
Top PZ Location:Sec:9 Twp: 7S 96WFootage: 2281 FNL  168 FEL
Bottom Hole Location:Sec:9 Twp: 7S 96WFootage: 2314 FNL  181 FEL
Log Types:CBL/PULSED NEUTRON LOG/TRIPLE COMBO IN 045-22704
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 108 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: 108 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1080 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 1080 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7224 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 765, Top: 3630 ft., Bottom: 7224 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2354 ft.
MESAVERDE4099 ft.
OHIO CREEK4099 ft.
WILLIAMS FORK4225 ft.
CAMEO6685 ft.
ROLLINS7080 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 6/1/2024                  Interval Top: 5406 ft.    Interval Bottom: 7005 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/6/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/10/2017Treatment End Date:7/15/2017
Treatment Summary:61563 bbls of slickwater; 1179760 100/Mesh; 3450 gals of biocide
Total fluid used in treatment (bbls):61645Max pressure during treatment (psi):5490
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):61563Total flowback volume recovered (bbls):9845
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1179760Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1074
CALC_MCF_GAS 2400
CASING_PRESS 1900
MCF_GAS 2400
TUBING_PRESS 1700
Perforation Data:
Interval Top:5406 ft.# Of Holes:192
Interval Bottom:7005 ft.Hole Size:0.35 in.

Formation WMFK                     Formation Classification:  OW                     Status:  CM - 12/12/2019                Interval Top: 5196 ft.    Interval Bottom: 5390 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/9/2018Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:5196 ft.# Of Holes:24
Interval Bottom:5390 ft.Hole Size:0.35 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
05/31/2024
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No