Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22679
Well Classification: GW Status: PR - 11/16/2017
Well Name/No:Federal GM #322-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date11/16/2017
FacilityID:440606LocationID:322536
County:GARFIELD #045Location:SENW 10 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6148 ft.
Basin:PICEANCE BASIN  
Planned Location:2110FNL  1915 FWLLat/Long: 39.452991 / -108.096591Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.452990 / -108.096591Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/29/2017
End Date: 11/3/2017
Reported: 11/27/2017
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/16/2017             Measured TD: 7373 ft.    Vertical TD: 6905 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/16/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/11/2018
Proposed Top PZ Location:Sec:10 Twp: 7S 96W Footage: 193 FNL  2225 FWL
Bottom Hole Location:Sec:10 Twp: 7S 96W Footage: 193 FNL  2225 FWL
Proposed Depth/Form:7380 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1172 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 283, Top: 0 ft., Bottom: 1172 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7380 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 605, Top: 3980 ft., Bottom: 7380 ft.

Wellbore Completed
Completion Date:8/9/2017
Spud Date:8/5/2017Spud Date Is:ACTUAL
Measured TD:7373 ft.Measured PB depth:7331 ft.
True Vertical TD:6905 ft.True Vertical PB depth:6863 ft.
Top PZ Location:Sec:10 Twp: 7S 96WFootage: 156 FNL  2260 FWL
Bottom Hole Location:Sec:10 Twp: 7S 96WFootage: 194 FNL  2218 FWL
Log Types:CBL/PULSED NEUTRON LOG/TRIPLE COMBO IN 045-22704
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 108 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: 108 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1189 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 1189 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7373 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 4770 ft., Bottom: 7373 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2247 ft.
MESAVERDE4230 ft.
OHIO CREEK4230 ft.
WILLIAMS FORK4309 ft.
CAMEO6918 ft.
ROLLINS7237 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/16/2017                Interval Top: 5474 ft.    Interval Bottom: 7170 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/16/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/29/2017Treatment End Date:11/3/2017
Treatment Summary:55608 bbls of slickwater; No Proppant; 1223 gals of biocide
Total fluid used in treatment (bbls):55637Max pressure during treatment (psi):4655
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):55608Total flowback volume recovered (bbls):12997
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7007 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/16/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1084
CALC_MCF_GAS 1949
CASING_PRESS 1800
MCF_GAS 1949
TUBING_PRESS 1400
Perforation Data:
Interval Top:5474 ft.# Of Holes:216
Interval Bottom:7170 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)55
Total Gas Produced (MCF)28690
GOR521636
GOR DeterminationMCFE
Average BOE per Day13.710
Average MCFE per Day79.479

 Federal Financial Assurance  i Y

 Tribal Well  i No