Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22666
Well Classification: GW Status: PR - 12/14/2017
Well Name/No:GM #443-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date12/14/2017
FacilityID:440593LocationID:334816
County:GARFIELD #045Location:LOT 7 5 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5977 ft.
Basin:PICEANCE BASIN  
Planned Location:715FSL  916 FELLat/Long: 39.460994 / -108.125589Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.460992 / -108.125589Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/22/2017
End Date: 11/27/2017
Reported: 12/18/2017
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/14/2017             Measured TD: 6705 ft.    Vertical TD: 6525 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/14/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/12/2019
Proposed Top PZ Location:Sec:5 Twp: 7S 96W Footage: 1745 FSL  975 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96W Footage: 1745 FSL  975 FEL
Proposed Depth/Form:6716 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 85 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 142, Top: 0 ft., Bottom: 85 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 244, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6732 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 571, Top: 3527 ft., Bottom: 6732 ft.

Wellbore Completed
Completion Date:9/26/2017
Spud Date:9/21/2017Spud Date Is:ACTUAL
Measured TD:6705 ft.Measured PB depth:6657 ft.
True Vertical TD:6525 ft.True Vertical PB depth:6477 ft.
Top PZ Location:Sec:5 Twp: 7S 96WFootage: 1732 FSL  975 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96WFootage: 1732 FSL  975 FEL
Log Types:CBL/PULSED NEUTRON LOG/TRIPLE COMBO IN 045-22666
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 109 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 182, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1044 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1044 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6705 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 3402 ft., Bottom: 6705 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2193 ft.
MESAVERDE3702 ft.
OHIO CREEK3702 ft.
WILLIAMS FORK3944 ft.
CAMEO4872 ft.
ROLLINS6682 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/14/2017                Interval Top: 4900 ft.    Interval Bottom: 6605 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/13/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/22/2017Treatment End Date:11/27/2017
Treatment Summary:43586 bbls of slickwater; 782141 100/Mesh; 1113 gals of biocide
Total fluid used in treatment (bbls):43613Max pressure during treatment (psi):4870
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):43586Total flowback volume recovered (bbls):16019
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):782141Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6434 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/14/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1083
CALC_MCF_GAS 2853
CASING_PRESS 1730
MCF_GAS 2853
TUBING_PRESS 1640
Perforation Data:
Interval Top:4900 ft.# Of Holes:216
Interval Bottom:6605 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)62
Total Gas Produced (MCF)38412
GOR619548
GOR DeterminationMCFE
Average BOE per Day18.318
Average MCFE per Day106.246

 Federal Financial Assurance  i Y

 Tribal Well  i No