Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22665
Well Classification: GW Status: PR - 12/16/2017
Well Name/No:GM #434-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date12/16/2017
FacilityID:440592LocationID:334816
County:GARFIELD #045Location:LOT 7 5 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5977 ft.
Basin:PICEANCE BASIN  
Planned Location:678FSL  927 FELLat/Long: 39.460892 / -108.125628Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.460891 / -108.125628Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/29/2017
End Date: 12/1/2017
Reported: 12/13/2017
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/16/2017             Measured TD: 6916 ft.    Vertical TD: 6553 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/16/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/12/2019
Proposed Top PZ Location:Sec:5 Twp: 7S 96W Footage: 339 FSL  2347 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96W Footage: 339 FSL  2347 FEL
Proposed Depth/Form:6810 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 85 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 142, Top: 0 ft., Bottom: 85 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 244, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6926 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 586, Top: 3631 ft., Bottom: 6926 ft.

Wellbore Completed
Completion Date:10/14/2017
Spud Date:10/11/2017Spud Date Is:ACTUAL
Measured TD:6916 ft.Measured PB depth:6875 ft.
True Vertical TD:6553 ft.True Vertical PB depth:6512 ft.
Top PZ Location:Sec:5 Twp: 7S 96WFootage: 370 FSL  2337 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96WFootage: 312 FSL  2342 FEL
Log Types:CBL/PULSED NEUTRON LOG/TRIPLE COMBO IN 045-22668
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 109 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 182, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1039 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1039 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6916 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 3627 ft., Bottom: 6916 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2369 ft.
MESAVERDE3806 ft.
OHIO CREEK3806 ft.
WILLIAMS FORK3979 ft.
CAMEO6399 ft.
ROLLINS6759 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/16/2017                Interval Top: 5162 ft.    Interval Bottom: 6684 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/14/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/29/2017Treatment End Date:12/1/2017
Treatment Summary:33243 bbls of slickwater; No Proppant; 870 gals of biocide
Total fluid used in treatment (bbls):33264Max pressure during treatment (psi):5539
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):33243Total flowback volume recovered (bbls):8811
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6529 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/16/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CALC_MCF_GAS 2060
CASING_PRESS 1257
MCF_GAS 2060
TUBING_PRESS 1101
Perforation Data:
Interval Top:5162 ft.# Of Holes:192
Interval Bottom:6684 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)52
Total Gas Produced (MCF)30886
GOR593961
GOR DeterminationMCFE
Average BOE per Day14.725
Average MCFE per Day85.438

 Federal Financial Assurance  i Y

 Tribal Well  i No