Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22664
Well Classification: GW Status: PR - 12/13/2017
Well Name/No:GM #43-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date12/13/2017
FacilityID:440591LocationID:334816
County:GARFIELD #045Location:LOT 7 5 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5977 ft.
Basin:PICEANCE BASIN  
Planned Location:734FSL  904 FELLat/Long: 39.461047 / -108.125547Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.461045 / -108.125547Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/18/2017
End Date: 11/21/2017
Reported: 12/6/2017
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/13/2017             Measured TD: 7234 ft.    Vertical TD: 6698 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/13/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/12/2019
Proposed Top PZ Location:Sec:5 Twp: 7S 96W Footage: 2502 FSL  975 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96W Footage: 2502 FSL  975 FEL
Proposed Depth/Form:7048 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 85 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 142, Top: 0 ft., Bottom: 85 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1111 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 269, Top: 0 ft., Bottom: 1111 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7235 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 3930 ft., Bottom: 7235 ft.

Wellbore Completed
Completion Date:9/13/2017
Spud Date:9/10/2017Spud Date Is:ACTUAL
Measured TD:7234 ft.Measured PB depth:7195 ft.
True Vertical TD:6698 ft.True Vertical PB depth:6659 ft.
Top PZ Location:Sec:5 Twp: 7S 96WFootage: 2516 FSL  941 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96WFootage: 2477 FSL  968 FEL
Log Types:CBL/PULSED NEUTRON/(TRIPLE COMBO IN 045-22668)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 109 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 182, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1123 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1123 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7234 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 3606 ft., Bottom: 7234 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2461 ft.
MESAVERDE4122 ft.
OHIO CREEK4122 ft.
WILLIAMS FORK4291 ft.
CAMEO6676 ft.
ROLLINS7074 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/13/2017                Interval Top: 5494 ft.    Interval Bottom: 6991 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/13/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/18/2017Treatment End Date:11/21/2017
Treatment Summary:37595 bbls of slickwater; 679500 100/Mesh; 841 gals of biocide
Total fluid used in treatment (bbls):37615Max pressure during treatment (psi):5798
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):37595Total flowback volume recovered (bbls):17229
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):679500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6840 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/13/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1065
CALC_MCF_GAS 2596
CASING_PRESS 1610
MCF_GAS 2596
TUBING_PRESS 1450
Perforation Data:
Interval Top:5494 ft.# Of Holes:192
Interval Bottom:6991 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)96
Total Gas Produced (MCF)59215
GOR616822
GOR DeterminationMCFE
Average BOE per Day28.227
Average MCFE per Day163.725

 Federal Financial Assurance  i Y

 Tribal Well  i No