Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22602
Well Classification: GW Status: PR - 7/20/2016
Well Name/No:Federal RU #413-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC50944
Facility Status:PRStatus Date7/20/2016
FacilityID:439829LocationID:324106
County:GARFIELD #045Location:NWSW 6 7S93W 6
Field:RULISON - #75400Elevation:6985 ft.
Basin:PICEANCE BASIN  
Planned Location:1936FSL  521 FWLLat/Long: 39.467088 / -107.824738Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.467088 / -107.824738Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/16/2016
End Date: 6/25/2016
Reported: 7/28/2016
Days to report: 33
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/20/2016             Measured TD: 9299 ft.    Vertical TD: 9157 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/20/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:6 Twp: 7S 93W Footage: 703 FSL  1268 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93W Footage: 703 FSL  1268 FWL
Proposed Depth/Form:9262 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 296, Top: 0 ft., Bottom: 1124 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9290 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 797, Top: 5307 ft., Bottom: 9290 ft.

Wellbore Completed
Completion Date:3/20/2016
Spud Date:3/14/2016Spud Date Is:ACTUAL
Measured TD:9299 ft.Measured PB depth:9191 ft.
True Vertical TD:9157 ft.True Vertical PB depth:9049 ft.
Top PZ Location:Sec:6 Twp: 7S 93WFootage: 734 FSL  1281 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93WFootage: 720 FSL  1287 FWL
Log Types:CBL/RPM/Triple Combo
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1131 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9289 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1080, Top: 3777 ft., Bottom: 9289 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3010 ft.
MESAVERDE5496 ft.
WILLIAMS FORK5496 ft.
CAMEO8296 ft.
ROLLINS9122 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/20/2016                 Interval Top: 6619 ft.    Interval Bottom: 9068 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/17/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/16/2016Treatment End Date:6/25/2016
Treatment Summary:91755 BBLS Slickwater; 1794696 40/70 Sand; (summary)
Total fluid used in treatment (bbls):91755Max pressure during treatment (psi):5880
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):91755Total flowback volume recovered (bbls):18682
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1794696Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8809 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/20/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1056
CALC_MCF_GAS 1225
CASING_PRESS 2114
MCF_GAS 1225
TUBING_PRESS 1487
Perforation Data:
Interval Top:6619 ft.# Of Holes:264
Interval Bottom:9068 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)118
Total Gas Produced (MCF)77163
GOR653923
GOR DeterminationMCFE
Average BOE per Day36.784
Average MCFE per Day213.360

 Federal Financial Assurance  i Y

 Tribal Well  i No