Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22239
Well Classification: GW Status: PR - 8/1/2015
Well Name/No:FEDERAL #PA 41-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date8/1/2015
FacilityID:435152LocationID:335233
County:GARFIELD #045Location:LOT 8 27 6S95W 6
Field:PARACHUTE - #67350Elevation:5856 ft.
Basin:PICEANCE BASIN  
Planned Location:2352FNL  647 FELLat/Long: 39.496038 / -107.977747Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.496038 / -107.977747Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/11/2015
End Date: 6/17/2015
Reported: 8/13/2015
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2015             Measured TD: 8721 ft.    Vertical TD: 8550 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2015
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/22/2015
Proposed Top PZ Location:Sec:27 Twp: 6S 95W Footage: 974 FNL  524 FEL
Bottom Hole Location:Sec:27 Twp: 6S 95W Footage: 974 FNL  524 FEL
Proposed Depth/Form:8689 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: N2,N2S2, SESE
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2852 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 724, Top: 0 ft., Bottom: 2852 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8838 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 926, Top: 4910 ft., Bottom: 8838 ft.

Wellbore Completed
Completion Date:11/26/2014
Spud Date:11/18/2014Spud Date Is:ACTUAL
Measured TD:8721 ft.Measured PB depth:8641 ft.
True Vertical TD:8550 ft.True Vertical PB depth:8470 ft.
Top PZ Location:Sec:27 Twp: 6S 95WFootage: 974 FNL  524 FEL
Bottom Hole Location:Sec:27 Twp: 6S 95WFootage: 987 FNL  531 FEL
Log Types:CBL/MUD/Triple Combination
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2942 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 0 ft., Bottom: 2942 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8711 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1065, Top: 3505 ft., Bottom: 8711 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2646 ft.
MESAVERDE5050 ft.
WILLIAMS FORK5050 ft.
CAMEO7912 ft.
ROLLINS8578 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2015                 Interval Top: 6201 ft.    Interval Bottom: 8514 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/18/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/11/2015Treatment End Date:6/17/2015
Treatment Summary:48162 BBLs Slickwater; 684800 #40/70 Sand; (summary)
Total fluid used in treatment (bbls):48162Max pressure during treatment (psi):6768
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.73
Recycled water used in treatment (bbls):48162Total flowback volume recovered (bbls):10938
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):684800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8297 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1094
CALC_MCF_GAS 924
CASING_PRESS 2183
MCF_GAS 924
TUBING_PRESS 1804
Perforation Data:
Interval Top:6201 ft.# Of Holes:183
Interval Bottom:8514 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)115
Total Gas Produced (MCF)42715
GOR371434
GOR DeterminationMCFE
Average BOE per Day20.499
Average MCFE per Day118.889

 Federal Financial Assurance  i Y

 Tribal Well  i No