|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/28/2014 Measured TD: 10360 ft. Vertical TD: 8913 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/28/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/28/2015 | | Proposed Top PZ Location: | Sec:21 Twp: 6S 95W | Footage: 259 FNL 310 FEL | | Bottom Hole Location: | Sec:21 Twp: 6S 95W | Footage: 259 FNL 310 FEL | | Proposed Depth/Form: | 10338 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 1297 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 339, Top: 0 ft., Bottom: 1297 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10338 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 908, Top: 6439 ft., Bottom: 10338 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/8/2013 | | Spud Date: | 10/23/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 10360 ft. | Measured PB depth: | 10287 ft. | | True Vertical TD: | 8913 ft. | True Vertical PB depth: | 8840 ft. | | Top PZ Location: | Sec:21 Twp: 6S 95W | Footage: 260 FNL 269 FEL | | Bottom Hole Location: | Sec:21 Twp: 6S 95W | Footage: 254 FNL 321 FEL | | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 85 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 85 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 345, Top: 0 ft., Bottom: 1300 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10348 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1004, Top: 5850 ft., Bottom: 10348 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 3799 ft. | | | | | MESAVERDE | 6657 ft. | | | | | CAMEO | 9500 ft. | | | | | ROLLINS | 10263 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 1/28/2014 Interval Top: 8066 ft. Interval Bottom: 10055 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 1/3/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/2/2014 | Treatment End Date: | 1/6/2014 | | Treatment Summary: | 1309600# 40/70 Sand; 58311 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on commingled volumes.
| | Total fluid used in treatment (bbls): | 58311 | Max pressure during treatment (psi): | 6381 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.57 | | Recycled water used in treatment (bbls): | 58311 | Total flowback volume recovered (bbls): | 22035 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1309600 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9701 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/28/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1042 | | CALC_MCF_GAS | 732 | | CASING_PRESS | 2921 | | MCF_GAS | 732 | | TUBING_PRESS | 1974 |
| | Perforation Data: | | Interval Top: | 8066 ft. | # Of Holes: | 147 | | Interval Bottom: | 10055 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 84 |
| Total Gas Produced (MCF) | 31063 |
| GOR | 369797 |
| GOR Determination | MCFE |
| Average BOE per Day | 14.897 |
| Average MCFE per Day | 86.416 |
| Federal Financial Assurance | i | Y |
|
|