Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21799
Well Classification: GW Status: PR - 1/18/2014
Well Name/No:Federal #RU 321-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC41916
Facility Status:PRStatus Date1/18/2014
FacilityID:430871LocationID:383328
County:GARFIELD #045Location:LOT 2 5 7S93W 6
Field:RULISON - #75400Elevation:7602 ft.
Basin:PICEANCE BASIN  
Planned Location:235FNL  2608 FWLLat/Long: 39.474712 / -107.798787Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.474712 / -107.798786Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/21/2013
End Date: 12/27/2013
Reported: 1/30/2014
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/18/2014             Measured TD: 10005 ft.    Vertical TD: 9978 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/18/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/25/2014
Proposed Top PZ Location:Sec:5 Twp: 7S 93W Footage: 533 FNL  2129 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93W Footage: 533 FNL  2129 FWL
Proposed Depth/Form:10017 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1103 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 291, Top: 0 ft., Bottom: 1103 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10017 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 978, Top: , Bottom: 10017 ft.

Wellbore Completed
Completion Date:10/29/2013
Spud Date:10/21/2013Spud Date Is:ACTUAL
Measured TD:10005 ft.Measured PB depth:9885 ft.
True Vertical TD:9978 ft.True Vertical PB depth:9858 ft.
Top PZ Location:Sec:5 Twp: 7S 93WFootage: 537 FNL  2156 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93WFootage: 594 FNL  2130 FWL
Log Types:RPMCBLMUDLOGS (LAS_SENT_TO_COGCC 12/12/2013)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1159 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1159 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9995 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 945, Top: 4946 ft., Bottom: 9995 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3594 ft.
MESAVERDE6145 ft.
CAMEO9041 ft.
ROLLINS9847 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/18/2014                 Interval Top: 7900 ft.    Interval Bottom: 9473 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/21/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2013Treatment End Date:12/27/2013
Treatment Summary:1613 Gals 7 ½% HCL; 673600# 40/70 Sand: 18900 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):18938Max pressure during treatment (psi):7526
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):18900Total flowback volume recovered (bbls):8920
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):673600Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9321 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/18/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1157
CALC_MCF_GAS 1091
CASING_PRESS 2195
MCF_GAS 1091
TUBING_PRESS 1900
Perforation Data:
Interval Top:7900 ft.# Of Holes:126
Interval Bottom:9473 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)75
Total Gas Produced (MCF)13663
GOR182173
GOR DeterminationMCFE
Average BOE per Day6.662
Average MCFE per Day38.640

 Federal Financial Assurance  i Y

 Tribal Well  i No