|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/6/2014 Measured TD: 10328 ft. Vertical TD: 10098 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/6/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/25/2014 | | Proposed Top PZ Location: | Sec:32 Twp: 6S 93W | Footage: 1465 FSL 1799 FWL | | Bottom Hole Location: | Sec:32 Twp: 6S 93W | Footage: 1465 FSL 1799 FWL | | Proposed Depth/Form: | 10310 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-47 , Unit Acreage: 640, Drill Unit: All | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 296, Top: 0 ft., Bottom: 1124 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10310 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 988, Top: , Bottom: 10310 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/26/2014 | | Spud Date: | 8/18/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 10328 ft. | Measured PB depth: | 10232 ft. | | True Vertical TD: | 10098 ft. | True Vertical PB depth: | 10002 ft. | | Top PZ Location: | Sec:32 Twp: 6S 93W | Footage: 1479 FSL 1812 FWL | | Bottom Hole Location: | Sec:32 Twp: 6S 93W | Footage: 1448 FSL 1786 FWL | | Log Types: | SP GR HDIL ZDL CN CBL MUDLOGS | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1133 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 305, Top: 0 ft., Bottom: 1133 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10295 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1045, Top: 5308 ft., Bottom: 10295 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 3728 ft. | | N | | | MESAVERDE | 6415 ft. | | N | | | CAMEO | 9316 ft. | | N | | | ROLLINS | 10160 ft. | | N | |
Formation WFCM Formation Classification: OW Status: PR - 12/6/2014 Interval Top: 8212 ft. Interval Bottom: 10001 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/11/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/9/2014 | Treatment End Date: | 10/15/2014 | | Treatment Summary: | 7 STAGES; 1499 Gals 7 ½% HCL; 691600 # 40/70 Sand: 20128 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 20164 | Max pressure during treatment (psi): | 5290 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 35 | Min frac gradient (psi/ft): | 0.68 | | Recycled water used in treatment (bbls): | 20128 | Total flowback volume recovered (bbls): | 17592 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 691600 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9828 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/6/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1152 | | CALC_MCF_GAS | 980 | | CASING_PRESS | 1927 | | MCF_GAS | 980 | | TUBING_PRESS | 897 |
| | Perforation Data: | | Interval Top: | 8212 ft. | # Of Holes: | 165 | | Interval Bottom: | 10001 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 94 |
| Total Gas Produced (MCF) | 17284 |
| GOR | 183872 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.424 |
| Average MCFE per Day | 48.858 |
| Federal Financial Assurance | i | Y |
|
|