Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21794
Well Classification: GW Status: PR - 3/1/2014
Well Name/No:Federal #RU 22-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC41916
Facility Status:PRStatus Date3/1/2014
FacilityID:430866LocationID:383328
County:GARFIELD #045Location:LOT 2 5 7S93W 6
Field:RULISON - #75400Elevation:7602 ft.
Basin:PICEANCE BASIN  
Planned Location:250FNL  2612 FWLLat/Long: 39.474673 / -107.798771Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.474673 / -107.798770Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/2/2013
End Date: 11/7/2013
Reported: 1/2/2014
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2014             Measured TD: 10050 ft.    Vertical TD: 9983 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/25/2014
Proposed Top PZ Location:Sec:5 Twp: 7S 93W Footage: 806 FNL  1888 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93W Footage: 834 FNL  1863 FWL
Proposed Depth/Form:10041 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1108 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 292, Top: 0 ft., Bottom: 1108 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10041 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 976, Top: , Bottom: 10041 ft.

Wellbore Completed
Completion Date:9/15/2013
Spud Date:9/4/2013Spud Date Is:ACTUAL
Measured TD:10050 ft.Measured PB depth:9971 ft.
True Vertical TD:9983 ft.True Vertical PB depth:9904 ft.
Top PZ Location:Sec:5 Twp: 7S 93WFootage: 806 FNL  1888 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93WFootage: 834 FNL  1863 FWL
Log Types:RPM/CBL/MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1120 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1120 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10036 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1045, Top: 4894 ft., Bottom: 10036 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3621 ft.
MESAVERDE6170 ft.
CAMEO9068 ft.
ROLLINS9869 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 3/1/2014                  Interval Top: 7969 ft.    Interval Bottom: 9595 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/3/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/2/2013Treatment End Date:11/7/2013
Treatment Summary:1502 Gals 7 ½% HCL; 681400 # 40/70 Sand: 19179 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):19214Max pressure during treatment (psi):6239
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):35Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):19179Total flowback volume recovered (bbls):9871
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):681400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9404 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1140
CALC_MCF_GAS 1394
CASING_PRESS 1864
MCF_GAS 1394
TUBING_PRESS 742
Perforation Data:
Interval Top:7969 ft.# Of Holes:129
Interval Bottom:9595 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)78
Total Gas Produced (MCF)14159
GOR181525
GOR DeterminationMCFE
Average BOE per Day6.889
Average MCFE per Day39.997

 Federal Financial Assurance  i Y

 Tribal Well  i No