Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-21741
Well Classification: GW Status: PR - 6/4/2013
Well Name/No:Shideler Fee #6-3A (O31E)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/4/2013
FacilityID:430558LocationID:334156
County:GARFIELD #045Location:SWSE 31 7S92W 6
Field:MAMM CREEK - #52500Elevation:7107 ft.
Basin:PICEANCE BASIN  
Planned Location:176FSL  2071 FELLat/Long: 39.396267 / -107.706296Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.396261 / -107.706307Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/26/2013
End Date: 4/3/2013
Reported: 6/26/2013
Days to report: 84
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/4/2013             Measured TD: 8530 ft.    Vertical TD: 8520 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/4/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/23/2014
Proposed Top PZ Location:Sec:6 Twp: 8S 92W Footage: 38 FNL  2232 FEL
Bottom Hole Location:Sec:6 Twp: 8S 92W Footage: 38 FNL  2232 FEL
Proposed Depth/Form:8594 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:Hunter Mesa Unit Number:COC055972X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: Linepipe , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1001 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 327, Top: 0 ft., Bottom: 1001 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8594 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 494, Top: 0 ft., Bottom: 8594 ft.

Wellbore Completed
Completion Date:1/26/2013
Spud Date:11/24/2012Spud Date Is:ACTUAL
Measured TD:8530 ft.Measured PB depth:8394 ft.
True Vertical TD:8520 ft.True Vertical PB depth:8384 ft.
Top PZ Location:Sec:6 Twp: 8S 92WFootage: 34 FNL  2346 FEL
Bottom Hole Location:Sec:6 Twp: 8S 92WFootage: 31 FNL  2337 FEL
Log Types:CBL, RST, Mudlog
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 82 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 82 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1040 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 344, Top: 82 ft., Bottom: 1055 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8472 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 927, Top: 4490 ft., Bottom: 8472 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5122 ft.8299 ft.

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 4/26/2013                 Interval Top: 6444 ft.    Interval Bottom: 8237 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:4/25/2013Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/26/2013Treatment End Date:4/25/2013
Treatment Summary:State 1 - Stage 3 treated with a total of 88,000 bbls of Slickwater (BWS).
Total fluid used in treatment (bbls):88000Max pressure during treatment (psi):5052
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):3.00
Recycled water used in treatment (bbls):88000Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7598 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/26/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 917
BTU_GAS 1170
CASING_PRESS 2450
MCF_GAS 1686
TUBING_PRESS 1600
Perforation Data:
Interval Top:6444 ft.# Of Holes:162
Interval Bottom:8237 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)68
Total Gas Produced (MCF)39622
GOR582676
GOR DeterminationMCFE
Average BOE per Day18.906
Average MCFE per Day109.663

 Federal Financial Assurance  i Y

 Tribal Well  i No