|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/31/2013 Measured TD: 9118 ft. Vertical TD: 8708 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/31/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/23/2014 | | Proposed Top PZ Location: | Sec:31 Twp: 7S 92W | Footage: 538 FSL 38 FWL | | Bottom Hole Location: | Sec:31 Twp: 7S 92W | Footage: 538 FSL 38 FWL | | Proposed Depth/Form: | 9136 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | Hunter Mesa | Unit Number: | COC055972X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: Linepipe , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1187 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 377, Top: 0 ft., Bottom: 1187 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9127 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 503, Top: 0 ft., Bottom: 9127 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/10/2012 | | Spud Date: | 12/2/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 9118 ft. | Measured PB depth: | 9049 ft. | | True Vertical TD: | 8708 ft. | True Vertical PB depth: | 8640 ft. | | Top PZ Location: | Sec:31 Twp: 7S 92W | Footage: 527 FSL 52 FWL | | Bottom Hole Location: | Sec:31 Twp: 7S 92W | Footage: 533 FSL 48 FWL | | Log Types: | CBL, mudlog, RST | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1358 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 435, Top: 0 ft., Bottom: 1358 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.75 in., Top: 0 ft., Depth: 9098 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 890, Top: 5460 ft., Bottom: 9118 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 5956 ft. | 8924 ft. | | |
Formation WMFK Formation Classification: OW Status: PR - 3/1/2014 Interval Top: 7012 ft. Interval Bottom: 8747 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/20/2013 | Treatment End Date: | 4/12/2013 | | Treatment Summary: | Stage 1 - Stage 6 treated with a total of 85,999 bbls of Slickwater (BWS). | | Total fluid used in treatment (bbls): | 85999 | Max pressure during treatment (psi): | 5795 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.63 | | Recycled water used in treatment (bbls): | 85999 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7966 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 7012 ft. | # Of Holes: | 162 | | Interval Bottom: | 8747 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 85 |
| Total Gas Produced (MCF) | 49033 |
| GOR | 576858 |
| GOR Determination | MCFE |
| Average BOE per Day | 23.400 |
| Average MCFE per Day | 135.720 |
| Federal Financial Assurance | i | Y |
|
|