|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/31/2013 Measured TD: 8175 ft. Vertical TD: 7146 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/31/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/10/2013 | | Proposed Top PZ Location: | Sec:9 Twp: 6S 91W | Footage: 523 FSL 2054 FEL | | Bottom Hole Location: | Sec:9 Twp: 6S 91W | Footage: 523 FSL 2054 FEL | | Proposed Depth/Form: | 8193 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 513-4 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 70 ft., Weight: 65# , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 70 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1492 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 388, Top: 0 ft., Bottom: 1492 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8193 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 721, Top: , Bottom: 8193 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/31/2012 | | Spud Date: | 10/19/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8175 ft. | Measured PB depth: | 7985 ft. | | True Vertical TD: | 7146 ft. | True Vertical PB depth: | 6956 ft. | | Top PZ Location: | Sec:9 Twp: 6s 91w | Footage: 562 FSL 2056 FEL | | Bottom Hole Location: | Sec:9 Twp: 6s 91w | Footage: 594 FSL 2036 FEL | | Log Types: | SP/GR/HDIL/ZDL/CN/MUD/RPM and CBL | | Log Types: | SP/GR/HDIL/ZDL/CN/MUD/CBL and Reservoir Performance Monitor (RPM) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 88 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 33, Top: 0 ft., Bottom: 88 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1510 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1510 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8156 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1393, Top: 4700 ft., Bottom: 8156 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 5790 ft., Depth: 5878 ft., Bottom: 5890 ft., Sacks: 350, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 4112 ft. | | | | | CAMEO | 7666 ft. | | | | | ROLLINS | 7898 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 5/31/2013 Interval Top: 5878 ft. Interval Bottom: 7889 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 4/11/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/11/2013 | Treatment End Date: | 4/1/2013 | | Treatment Summary: | 1500 Gals 7 1/2% HCL; 1074900#30/50 & 42000# 100-Mesh Sand; 35788 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
| | Total fluid used in treatment (bbls): | 35824 | Max pressure during treatment (psi): | 4819 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 35 | Min frac gradient (psi/ft): | 0.52 | | Recycled water used in treatment (bbls): | 35788 | Total flowback volume recovered (bbls): | 22411 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1074900 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7490 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2013 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1213 | | CALC_MCF_GAS | 778 | | CASING_PRESS | 698 | | MCF_GAS | 778 | | TUBING_PRESS | 289 |
| | Perforation Data: | | Interval Top: | 5878 ft. | # Of Holes: | 204 | | Interval Bottom: | 7889 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 42 |
| Total Gas Produced (MCF) | 14306 |
| GOR | 340619 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.877 |
| Average MCFE per Day | 39.866 |
| Federal Financial Assurance | i | |
|
|