Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20325
Well Classification: GW Status: PR - 10/16/2011
Well Name/No:KEINATH FEDERAL #9-12H2 (C10OU)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC58674
Facility Status:PRStatus Date10/16/2011
FacilityID:421158LocationID:334093
County:GARFIELD #045Location:NENW 10 8S96W 6
Field:PICEANCE HORIZONTAL NIOBRARA - #68810Elevation:5568 ft.
Basin:PICEANCE BASIN  
Planned Location:1023FNL  1544 FWLLat/Long: 39.368668 / -108.099242Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.368648 / -108.099265Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/30/2011
End Date: 8/30/2011
Reported: 3/30/2012
Prior to rule 205A.b.(2)(A)
Days to report: 213
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/16/2011             Measured TD: 13680 ft.    Vertical TD: 8449 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/16/2011
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/15/2013
Proposed Top PZ Location:Sec:10 Twp: 8S 96W Footage: 706 FNL  673 FWL
Bottom Hole Location:Sec:9 Twp: 8S 96W Footage: 2434 FSL  570 FWL
Proposed Depth/Form:14110 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit:ORCHARD Unit Number:COC 66496X
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 40 ft., Weight: LINEPIPE , Citings Type: PLANNED
Cement:Sacks: 5, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: , Depth: 1400 ft., Weight: 40.5 , Citings Type: PLANNED
Cement:Sacks: 665, Top: 0 ft., Bottom: 1400 ft.
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: , Depth: 7483 ft., Weight: 29.7 , Citings Type: PLANNED
Cement:Sacks: 1019, Top: 0 ft., Bottom: 7483 ft.
Casing:String Type: 2ND, Hole Size: 6.5 in., Size: 5 in., Top: , Depth: 14110 ft., Weight: 23.2 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 14110 ft.

Wellbore Completed
Completion Date:6/25/2011
Spud Date:2/12/2011Spud Date Is:ACTUAL
Measured TD:13680 ft.Measured PB depth:13548 ft.
True Vertical TD:8449 ft.True Vertical PB depth:8454 ft.
Top PZ Location:Sec:9 Twp: 8S 96WFootage: 876 FNL  310 FEL
Bottom Hole Location:Sec:9 Twp: 8S 96WFootage: 2402 FSL  1124 FWL
Log Types:RST, CBL (same log) and Mud.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 40 ft., Weight: 53 , Citings Type: ACTUAL
Cement:Sacks: 40, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 1549 ft., Weight: 40.50 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 0 ft., Bottom: 1549 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 7490 ft., Weight: 29.70 , Citings Type: ACTUAL
Cement:Sacks: 926, Top: 3280 ft., Bottom: 7490 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 6.5 in., Size: 5 in., Top: 0 ft., Depth: 13650 ft., Weight: 23.20 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 3670 ft., Bottom: 13680 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
ROLLINS5079 ft.5358 ft.NN
COZZETTE5359 ft.5597 ft.NN
CORCORAN5598 ft.6995 ft.NN
CASTLEGATE6996 ft.7207 ft.NN
MANCOS7208 ft.8922 ft.NN
NIOBRARA8923 ft.13680 ft.NN

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 10/16/2011                Interval Top: 8660 ft.    Interval Bottom: 13440 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/20/2011Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/30/2011
Treatment Summary:Stages 1-16 treated with a total of: 115,716 bbls of Slickwater, 698,749 lbs 100 Sand, 901,504 lbs 40-70 White.
Tubing Size:2.375 in.Tubing Setting Depth:8815 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/16/2011Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 470
BTU_GAS 1170
CALC_BBLS_H2O 470
CALC_MCF_GAS 4572
CASING_PRESS 1900
MCF_GAS 4572
TUBING_PRESS 1050
Perforation Data:
Interval Top:8660 ft.# Of Holes:1380
Interval Bottom:13440 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)85715
GOR85715000
GOR DeterminationMCFE
Average BOE per Day40.493
Average MCFE per Day234.838

 Federal Financial Assurance  i Y

 Tribal Well  i No