|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/15/2012 Measured TD: 11422 ft. Vertical TD: 11234 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/15/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/8/2013 | | Proposed Top PZ Location: | Sec:34 Twp: 5S 95W | Footage: 866 FNL 657 FEL | | Bottom Hole Location: | Sec:34 Twp: 5S 95W | Footage: 866 FNL 657 FEL | | Proposed Depth/Form: | 11261 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-49 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: , Depth: 120 ft., Weight: Linepipe , Citings Type: PLANNED | | Cement: | Sacks: 117, Top: 0 ft., Bottom: 120 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1800 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 383, Top: 0 ft., Bottom: 1800 ft. | | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 11261 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 592, Top: , Bottom: 11261 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/23/2012 | | Spud Date: | 11/24/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 11422 ft. | Measured PB depth: | 11374 ft. | | True Vertical TD: | 11234 ft. | True Vertical PB depth: | 11185 ft. | | Top PZ Location: | Sec:27 Twp: 5S 95W | Footage: 855 FNL 642 FEL | | Bottom Hole Location: | Sec:34 Twp: 5S 95W | Footage: 872 FNL 644 FEL | | Log Types: | RST, CBL (included in Triple Combo) and Mud. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1825 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 1825 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11398 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1533, Top: 2510 ft., Bottom: 11422 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 6608 ft. | 10165 ft. | N | N | | ROLLINS | 10166 ft. | 11422 ft. | N | N |
Formation RLNS Formation Classification: OW Status: PR - 8/13/2012 Interval Top: 10740 ft. Interval Bottom: 11006 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 8/6/2012 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/7/2012 | Treatment End Date: | 6/27/2012 | | Treatment Summary: | Stages 1, 1B treated with a total of: 58,581 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 58581 | Max pressure during treatment (psi): | 6694 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 12 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | 58581 | Total flowback volume recovered (bbls): | 36730 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/13/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 380 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 380 | | CALC_MCF_GAS | 5339 | | CASING_PRESS | 1327 | | MCF_GAS | 5339 |
| | Perforation Data: | | Interval Top: | 10740 ft. | # Of Holes: | 30 | | Interval Bottom: | 11006 ft. | Hole Size: | 0.42 in. |
|
Formation WMFK Formation Classification: OW Status: PR - 8/13/2012 Interval Top: 6614 ft. Interval Bottom: 10095 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 8/6/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/7/2012 | Treatment End Date: | 6/27/2012 | | Treatment Summary: | Stages 3-6, 9-11, 12A, 2A, 2B, 7A, 7B, 8A, 8B treated with a total of: 235,229 bbls of Slickwater. | | Total fluid used in treatment (bbls): | 235229 | Max pressure during treatment (psi): | 6694 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.50 | | Type Of gas: | | Number Of staged intervals: | 12 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | 235229 | Total flowback volume recovered (bbls): | 36730 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/13/2012 | Test Method: | Floiwing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 380 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 380 | | CALC_MCF_GAS | 5339 | | CASING_PRESS | 1327 | | MCF_GAS | 5339 |
| | Perforation Data: | | Interval Top: | 6614 ft. | # Of Holes: | 330 | | Interval Bottom: | 10095 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 261 |
| Total Gas Produced (MCF) | 45770 |
| GOR | 175363 |
| GOR Determination | MCFE |
| Average BOE per Day | 22.006 |
| Average MCFE per Day | 127.650 |
| Federal Financial Assurance | i | |
|
|