Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20226
Well Classification: GW Status: PR - 12/8/2011
Well Name/No:ExxonMobil #GM 344-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC34553
Facility Status:PRStatus Date12/8/2011
FacilityID:420791LocationID:335425
County:GARFIELD #045Location:LOT 1 27 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5770 ft.
Basin:PICEANCE BASIN  
Planned Location:968FNL  704 FELLat/Long: 39.499793 / -108.087705Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.499793 / -108.087701Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/29/2011
End Date: 7/29/2011
Reported: 2/22/2012
Prior to rule 205A.b.(2)(A)
Days to report: 208
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/8/2011             Measured TD: 7760 ft.    Vertical TD: 7344 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/8/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/11/2012
Proposed Top PZ Location:Sec:22 Twp: 6S 96W Footage: 928 FSL  859 FEL
Bottom Hole Location:Sec:22 Twp: 6S 96W Footage: 928 FSL  859 FEL
Proposed Depth/Form:7743 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: , Drill Unit: Unspaced
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1061 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 370, Top: 0 ft., Bottom: 1061 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7743 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 557, Top: , Bottom: 7743 ft.

Wellbore Completed
Completion Date:5/26/2011
Spud Date:5/18/2011Spud Date Is:ACTUAL
Measured TD:7760 ft.Measured PB depth:7688 ft.
True Vertical TD:7344 ft.True Vertical PB depth:7272 ft.
Top PZ Location:Sec:22 Twp: 6S 96WFootage: 942 FSL  860 FEL
Bottom Hole Location:Sec:22 Twp: 6S 96WFootage: 933 FSL  881 FEL
Log Types:SP/GR/HDIL/ZDL/CN AND CBL,MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 67 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 67 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1096 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1096 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7748 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 3248 ft., Bottom: 7748 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2441 ft.
MESAVERDE4469 ft.
CAMEO7174 ft.
ROLLINS7633 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 10/31/2011                Interval Top: 5910 ft.    Interval Bottom: 7565 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/31/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/29/2011
Treatment Summary:2453 GALS 7 1/2% HCL; 480300# 30/50 SAND; 41654 BBLS SLICKWATER; (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7396 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2011Test Method:FLKOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1101
CALC_MCF_GAS 1328
CASING_PRESS 1930
MCF_GAS 1328
TUBING_PRESS 1660
Perforation Data:
Interval Top:5910 ft.# Of Holes:109
Interval Bottom:7565 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)60
Total Gas Produced (MCF)29411
GOR490183
GOR DeterminationMCFE
Average BOE per Day14.060
Average MCFE per Day81.543

 Federal Financial Assurance  i Y

 Tribal Well  i No