Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20095
Well Classification: GW Status: PR - 10/1/2011
Well Name/No:ExxonMobil #GM 541-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27743
Facility Status:PRStatus Date10/1/2011
FacilityID:420051LocationID:335336
County:GARFIELD #045Location:NWNE 34 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5598 ft.
Basin:PICEANCE BASIN  
Planned Location:1102FNL  2183 FELLat/Long: 39.484907 / -108.092923Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.484915 / -108.092913Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/8/2011
End Date: 7/8/2011
Reported: 5/3/2012
Prior to rule 205A.b.(2)(A)
Days to report: 300
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2011             Measured TD: 7135 ft.    Vertical TD: 6961 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/26/2012
Proposed Top PZ Location:Sec:34 Twp: 6S 96W Footage: 1168 FNL  1022 FEL
Bottom Hole Location:Sec:34 Twp: 6S 96W Footage: 1168 FNL  1022 FEL
Proposed Depth/Form:7118 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-12 , Unit Acreage: 320, Drill Unit: N/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 712 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 248, Top: 0 ft., Bottom: 712 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7118 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 564, Top: , Bottom: 7118 ft.

Wellbore Completed
Completion Date:4/22/2011
Spud Date:4/14/2011Spud Date Is:ACTUAL
Measured TD:7135 ft.Measured PB depth:7085 ft.
True Vertical TD:6961 ft.True Vertical PB depth:6911 ft.
Top PZ Location:Sec:34 Twp: 6S 96WFootage: 1156 FNL  1017 FEL
Bottom Hole Location:Sec:34 Twp: 6S 96WFootage: 1188 FNL  968 FEL
Log Types:SP/GR/HDIL/ZDL/CN/CBL AND RPM Mud
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 0 , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 729 ft., Weight: 0 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 729 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7120 ft., Weight: 0 , Citings Type: ACTUAL
Cement:Sacks: 1020, Top: 3040 ft., Bottom: 7120 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2035 ft.
MESAVERDE3874 ft.
CAMEO6590 ft.
ROLLINS7009 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 8/31/2011                 Interval Top: 5300 ft.    Interval Bottom: 6963 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/18/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/7/2011
Treatment Summary:3406 ACID 7 1/2% HCL; 1179900# 30/50 SAND; 32040 BBLS SLICKWATER. (SUMMARY)
Tubing Size:6.125 in.Tubing Setting Depth:6761 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2011Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1081
CASING_PRESS 1552
MCF_GAS 1266
TUBING_PRESS 1412
Perforation Data:
Interval Top:5300 ft.# Of Holes:147
Interval Bottom:6963 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)5959
GOR458384
GOR DeterminationMCFE
Average BOE per Day2.854
Average MCFE per Day16.552

 Federal Financial Assurance  i Y

 Tribal Well  i No