Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20077
Well Classification: GW Status: PR - 4/15/2013
Well Name/No:Savage #PA 413-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/15/2013
FacilityID:419975LocationID:334813
County:GARFIELD #045Location:NESW 4 7S95W 6
Field:PARACHUTE - #67350Elevation:5586 ft.
Basin:PICEANCE BASIN  
Planned Location:1508FSL  1435 FWLLat/Long: 39.463483 / -108.006912Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.463484 / -108.006909Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/11/2013
End Date: 3/11/2013
Reported: 5/7/2013
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/15/2013             Measured TD: 7010 ft.    Vertical TD: 6923 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/15/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/2/2014
Proposed Top PZ Location:Sec:4 Twp: 7S 95W Footage: 1891 FSL  708 FWL
Bottom Hole Location:Sec:4 Twp: 7S 95W Footage: 1891 FSL  708 FWL
Proposed Depth/Form:7002 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 859 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 859 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7001 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 568, Top: 3531 ft., Bottom: 7001 ft.

Wellbore Completed
Completion Date:1/3/2013
Spud Date:1/2/2013Spud Date Is:ACTUAL
Measured TD:7010 ft.Measured PB depth:6962 ft.
True Vertical TD:6923 ft.True Vertical PB depth:6875 ft.
Top PZ Location:Sec:4 Twp: 7S 95WFootage: 1889 FSL  694 FWL
Bottom Hole Location:Sec:4 Twp: 7S 95WFootage: 1907 FSL  700 FWL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 41 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 41 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 887 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 887 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6995 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1080, Top: 2620 ft., Bottom: 6995 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1657 ft.
MESAVERDE3750 ft.
CAMEO5917 ft.
ROLLINS6873 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 3/31/2013                 Interval Top: 5102 ft.    Interval Bottom: 6766 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/21/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/19/2013Treatment End Date:3/8/2013
Treatment Summary:689397#40/70 Sand; 20516 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on comingled volumes.
Total fluid used in treatment (bbls):20516Max pressure during treatment (psi):5513
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):20516Total flowback volume recovered (bbls):15022
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):689397Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6600 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1016
CALC_MCF_GAS 1099
CASING_PRESS 1227
MCF_GAS 1099
TUBING_PRESS 1033
Perforation Data:
Interval Top:5102 ft.# Of Holes:120
Interval Bottom:6766 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)21645
GOR801666
GOR DeterminationMCFE
Average BOE per Day10.298
Average MCFE per Day59.746

 Federal Financial Assurance  i 

 Tribal Well  i No