Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-20061
Well Classification: GW Status: PR - 4/30/2013
Well Name/No:Savage #PA 444-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/30/2013
FacilityID:419925LocationID:334813
County:GARFIELD #045Location:NESW 4 7S95W 6
Field:PARACHUTE - #67350Elevation:5586 ft.
Basin:PICEANCE BASIN  
Planned Location:1482FSL  1450 FWLLat/Long: 39.463413 / -108.006857Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.463413 / -108.006853Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/30/2013
End Date: 1/30/2013
Reported: 3/28/2013
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/30/2013             Measured TD: 7615 ft.    Vertical TD: 6953 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/30/2013
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/2/2014
Proposed Top PZ Location:Sec:5 Twp: 7S 95W Footage: 629 FSL  720 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 629 FSL  720 FEL
Proposed Depth/Form:7582 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-36 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1236 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 431, Top: 0 ft., Bottom: 1236 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7581 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 561, Top: 4132 ft., Bottom: 7581 ft.

Wellbore Completed
Completion Date:12/3/2012
Spud Date:11/26/2012Spud Date Is:ACTUAL
Measured TD:7615 ft.Measured PB depth:7560 ft.
True Vertical TD:6953 ft.True Vertical PB depth:6898 ft.
Top PZ Location:Sec:5 Twp: 7s 95wFootage: 648 FSL  712 FEL
Bottom Hole Location:Sec:5 Twp: 7s 95wFootage: 655 FSL  710 FEL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 68 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 45, Top: 0 ft., Bottom: 68 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1249 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 1249 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7602 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1065, Top: 3880 ft., Bottom: 7602 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1642 ft.
MESAVERDE3682 ft.
CAMEO5992 ft.
ROLLINS6762 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 4/30/2013                 Interval Top: 5647 ft.    Interval Bottom: 7382 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/31/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/24/2013Treatment End Date:1/30/2013
Treatment Summary:793000#40/70 Sand; 22147 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on comingled volumes.
Total fluid used in treatment (bbls):22147Max pressure during treatment (psi):3041
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):22147Total flowback volume recovered (bbls):6892
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):793000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7200 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2013Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1032
CALC_MCF_GAS 421
CASING_PRESS 848
MCF_GAS 421
TUBING_PRESS 471
Perforation Data:
Interval Top:5647 ft.# Of Holes:133
Interval Bottom:7382 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)17274
GOR690960
GOR DeterminationMCFE
Average BOE per Day8.233
Average MCFE per Day47.749

 Federal Financial Assurance  i 

 Tribal Well  i No