|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/31/2011 Measured TD: 7385 ft. Vertical TD: 6996 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/31/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/7/2012 | | Proposed Top PZ Location: | Sec:34 Twp: 6S 96W | Footage: 768 FNL 374 FEL | | Bottom Hole Location: | Sec:34 Twp: 6S 96W | Footage: 768 FNL 374 FEL | | Proposed Depth/Form: | 7390 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 479-12 , Unit Acreage: 320, Drill Unit: N/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1245 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 434, Top: 0 ft., Bottom: 1245 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7390 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 569, Top: , Bottom: 7390 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/28/2011 | | Spud Date: | 4/22/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7385 ft. | Measured PB depth: | 7334 ft. | | True Vertical TD: | 6996 ft. | True Vertical PB depth: | 6995 ft. | | Top PZ Location: | Sec:34 Twp: 6s 96w | Footage: 765 FNL 378 FEL | | Bottom Hole Location: | Sec:34 Twp: 6s 96w | Footage: 771 FNL 366 FEL | | Log Types: | CBL AND RESERVOIR PERFORMANCE MONITOR (RPM) | | Log Types: | and Reservoir Performance Monitor (RPM) mud log,rabl | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 66 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 24, Top: 0 ft., Bottom: 66 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1256 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 1256 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7369 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1010, Top: 2602 ft., Bottom: 7369 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2112 ft. | | | | | MESAVERDE | 4103 ft. | | | | | CAMEO | 6790 ft. | | | | | ROLLINS | 7258 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 8/31/2011 Interval Top: 5592 ft. Interval Bottom: 7182 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/10/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/8/2011 | | Treatment Summary: | 2049 Gals 7 1/2% HCL; 1092400# 30/50 Sand; 26678 Bbls Slickwater;(Summary)
Please note: the "as-drilled" GPS information provided is actual data of the existing well conductor location prior to the big rig spud date
*All flowback water entries are total estimates based on comingled volumes.
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7005 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/31/2011 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1092 | | CALC_MCF_GAS | 1095 | | CASING_PRESS | 1282 | | MCF_GAS | 1095 | | TUBING_PRESS | 1070 |
| | Perforation Data: | | Interval Top: | 5592 ft. | # Of Holes: | 169 | | Interval Bottom: | 7182 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 53 |
| Total Gas Produced (MCF) | 25011 |
| GOR | 471905 |
| GOR Determination | MCFE |
| Average BOE per Day | 11.966 |
| Average MCFE per Day | 69.386 |
| Federal Financial Assurance | i | Y |
|
|