|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2025 Measured TD: 9488 ft. Vertical TD: 9241 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/3/2012 | | Proposed Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 2480 FSL 641 FEL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 2455 FSL 660 FEL | | Proposed Depth/Form: | 9490 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-21 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 100 ft., Weight: 53 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: , Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1480, Top: 0 ft., Bottom: 2000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 9490 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 4490 ft., Bottom: 9490 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/19/2011 | | Spud Date: | 2/5/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 9488 ft. | Measured PB depth: | 9371 ft. | | True Vertical TD: | 9241 ft. | True Vertical PB depth: | 9124 ft. | | Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 2483 FSL 629 FEL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 2447 FSL 694 FEL | | Log Types: | PNDL/GR, PND-S CASED HOLE TRIPLE COMBO, CBL/GR | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2412 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 2360, Top: 0 ft., Bottom: 2412 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9418 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 850, Top: 3540 ft., Bottom: 9418 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4602 ft. | | | | | FORT UNION | 4985 ft. | | | | | WILLIAMS FORK | 6305 ft. | | | | | CAMEO | 8871 ft. | | | | | ROLLINS | 9261 ft. | | | |
Formation WFCM Formation Classification: OW Status: SI - 7/1/2025 Interval Top: 7532 ft. Interval Bottom: 8967 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 6/30/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/13/2011 | | Treatment Summary: | Frac'd six stages using 31697 bbls of slickwater gel, 565543 lbs of 30/50 mesh Tejas Gold |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8665 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/31/2011 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 60 | | BBLS_OIL | 1 | | BTU_GAS | 1090 | | CALC_BBLS_H2O | 60 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 943000 | | CALC_MCF_GAS | 943 | | CASING_PRESS | 655 | | GRAVITY_OIL | 59 | | MCF_GAS | 943 | | TUBING_PRESS | 299 |
| | Perforation Data: | | Interval Top: | 7532 ft. | # Of Holes: | 159 | | Interval Bottom: | 8967 ft. | Hole Size: | 0.3125 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.006 |
| Average MCFE per Day | 0.033 |
| Federal Financial Assurance | i | |
|
|