Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19729
Well Classification: GW Status: PR - 8/31/2011
Well Name/No:ExxonMobil #GM 323-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/31/2011
FacilityID:418557LocationID:335397
County:GARFIELD #045Location:SESW 27 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5604 ft.
Basin:PICEANCE BASIN  
Planned Location:1150FSL  2531 FWLLat/Long: 39.491088 / -108.095117Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.491088 / -108.095116Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/1/2011
End Date: 7/1/2011
Reported: 9/26/2011
Prior to rule 205A.b.(2)(A)
Days to report: 87
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/31/2011             Measured TD: 7263 ft.    Vertical TD: 7041 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/31/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/3/2012
Proposed Top PZ Location:Sec:27 Twp: 6S 96W Footage: 2474 FSL  2328 FEL
Bottom Hole Location:Sec:27 Twp: 6S 96W Footage: 2474 FSL  2328 FEL
Proposed Depth/Form:7228 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-13 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 723 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 255, Top: 0 ft., Bottom: 723 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7228 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 560, Top: , Bottom: 7228 ft.

Wellbore Completed
Completion Date:4/8/2011
Spud Date:4/3/2011Spud Date Is:ACTUAL
Measured TD:7263 ft.Measured PB depth:6892 ft.
True Vertical TD:7041 ft.True Vertical PB depth:6670 ft.
Top PZ Location:Sec:27 Twp: 6S 96WFootage: 2485 FSL  2311 FEL
Bottom Hole Location:Sec:27 Twp: 6S 96WFootage: 2466 FSL  2329 FEL
Log Types:CBL AND RPM Mud
Log Types:CBL & RESERVOIR PERFORMANCE MONITOR (RBM)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 68 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 41, Top: 0 ft., Bottom: 68 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 745 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 745 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7252 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 3260 ft., Bottom: 7252 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2146 ft.
MESAVERDE4015 ft.
CAMEO6686 ft.
ROLLINS7159 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/31/2011                 Interval Top: 5479 ft.    Interval Bottom: 7068 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/9/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/28/2011
Treatment Summary:955165 # 30/50 SAND; 24523 BBLS SLICKWATER; (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6870 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2011Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1074
CASING_PRESS 662
MCF_GAS 1011
TUBING_PRESS 272
Perforation Data:
Interval Top:5479 ft.# Of Holes:110
Interval Bottom:7068 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)34
Total Gas Produced (MCF)20112
GOR591529
GOR DeterminationMCFE
Average BOE per Day9.587
Average MCFE per Day55.645

 Federal Financial Assurance  i 

 Tribal Well  i No