Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19660
Well Classification: GW Status: PR - 4/16/2011
Well Name/No:ExxonMobil #GM 23-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CA COC67283
Facility Status:PRStatus Date4/16/2011
FacilityID:418044LocationID:323789
County:GARFIELD #045Location:NWSE 27 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5655 ft.
Basin:PICEANCE BASIN  
Planned Location:1974FSL  1304 FELLat/Long: 39.493351 / -108.089822Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.493351 / -108.089823Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/12/2011
End Date: 2/12/2011
Reported: 5/3/2012
Prior to rule 205A.b.(2)(A)
Days to report: 446
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/16/2011             Measured TD: 8280 ft.    Vertical TD: 7182 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/16/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/28/2012
Proposed Top PZ Location:Sec:26 Twp: 6S 96W Footage: 2134 FSL  1618 FWL
Bottom Hole Location:Sec:26 Twp: 6S 96W Footage: 2134 FSL  1618 FWL
Proposed Depth/Form:7977 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-17 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1199 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 419, Top: 0 ft., Bottom: 1199 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7977 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 578, Top: , Bottom: 7977 ft.

Wellbore Completed
Completion Date:12/21/2010
Spud Date:12/14/2010Spud Date Is:ACTUAL
Measured TD:8280 ft.Measured PB depth:8210 ft.
True Vertical TD:7182 ft.True Vertical PB depth:7112 ft.
Top PZ Location:Sec:26 Twp: 6S 96WFootage: 2176 FSL  1849 FWL
Bottom Hole Location:Sec:26 Twp: 6S 96WFootage: 2173 FSL  1863 FWL
Log Types:CBL AND RESERVOIR PERFORMANCE MONITOR (RPM) Mud
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 70 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 26, Top: 0 ft., Bottom: 70 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1380 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 1380 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8264 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 3650 ft., Bottom: 8264 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2502 ft.
MESAVERDE5011 ft.
CAMEO7572 ft.
ROLLINS8137 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 6/18/2011                 Interval Top: 6230 ft.    Interval Bottom: 8048 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/15/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/12/2011
Treatment Summary:4,033 GALS OF 7.5% HCL; 1,186,816# OF 30/50 SAND; 32,747 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7760 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/18/2011Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1075
CASING_PRESS 2162
MCF_GAS 1244
TUBING_PRESS 1885
Perforation Data:
Interval Top:6230 ft.# Of Holes:148
Interval Bottom:8048 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)63
Total Gas Produced (MCF)25988
GOR412507
GOR DeterminationMCFE
Average BOE per Day12.448
Average MCFE per Day72.176

 Federal Financial Assurance  i 

 Tribal Well  i No