Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19512
Well Classification: GW Status: PR - 8/14/2012
Well Name/No:Federal #PA 523-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:62162
Facility Status:PRStatus Date8/14/2012
FacilityID:417410LocationID:335238
County:GARFIELD #045Location:SESW 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5675 ft.
Basin:PICEANCE BASIN  
Planned Location:597FSL  2264 FWLLat/Long: 39.489895 / -108.023071Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.489897 / -108.023070Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/18/2012
End Date: 6/18/2012
Reported: 8/9/2012
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/14/2012             Measured TD: 7931 ft.    Vertical TD: 7608 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/14/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/24/2012
Proposed Top PZ Location:Sec:29 Twp: 6S 95W Footage: 2362 FSL  2211 FWL
Bottom Hole Location:Sec:29 Twp: 6S 95W Footage: 2362 FSL  2211 FWL
Proposed Depth/Form:7951 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 2295 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 801, Top: 0 ft., Bottom: 2295 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7951 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 611, Top: 4195 ft., Bottom: 7951 ft.

Wellbore Completed
Completion Date:2/1/2012
Spud Date:1/24/2012Spud Date Is:ACTUAL
Measured TD:7931 ft.Measured PB depth:7877 ft.
True Vertical TD:7608 ft.True Vertical PB depth:7554 ft.
Top PZ Location:Sec:29 Twp: 6S 95wFootage: 2342 FSL  2209 FWL
Bottom Hole Location:Sec:29 Twp: 6s 95wFootage: 2371 FSL  2202 FWL
Log Types:SP/GR/HDIL/ZDL/CN and CBL/RPM/MUD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2318 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 540, Top: 0 ft., Bottom: 2318 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7906 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 3170 ft., Bottom: 7906 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2093 ft.
MESAVERDE4409 ft.
CAMEO7205 ft.
ROLLINS7795 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2012                 Interval Top: 5572 ft.    Interval Bottom: 7707 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/19/2012Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/11/2012Treatment End Date:6/18/2012
Treatment Summary:984400# 40/70 Sand; 27947.2 BBLS Slickwater.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.58
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):984400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7496 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2012Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1064
CALC_MCF_GAS 853
CASING_PRESS 1735
MCF_GAS 853
TUBING_PRESS 1446
Perforation Data:
Interval Top:5572 ft.# Of Holes:158
Interval Bottom:7707 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)17340
GOR619285
GOR DeterminationMCFE
Average BOE per Day8.268
Average MCFE per Day47.952

 Federal Financial Assurance  i Y

 Tribal Well  i No