Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-19147
Well Classification: GW Status: PR - 12/14/2010
Well Name/No:GMR #8-6A1 (K8W)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/14/2010
FacilityID:415718LocationID:311645
County:GARFIELD #045Location:NESW 8 7S93W 6
Field:RULISON - #75400Elevation:7826 ft.
Basin:PICEANCE BASIN  
Planned Location:1967FSL  1936 FWLLat/Long: 39.458222 / -107.799858Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.458232 / -107.799868Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/14/2010             Measured TD: 10210 ft.    Vertical TD: 9969 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/14/2010
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/17/2012
Proposed Top PZ Location:Sec:8 Twp: 7S 93W Footage: 1435 FNL  2427 FWL
Bottom Hole Location:Sec:8 Twp: 7S 93W Footage: 1435 FNL  2427 FWL
Proposed Depth/Form:11234 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-98 , Unit Acreage: 10, Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-98 , Unit Acreage: 10, Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 40 ft., Weight: LINEPIPE , Citings Type: PLANNED
Cement:Sacks: 5, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1250 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 703, Top: 0 ft., Bottom: 1250 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 11234 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1089, Top: 0 ft., Bottom: 11234 ft.

Wellbore Completed
Completion Date:7/20/2010
Spud Date:7/9/2010Spud Date Is:ACTUAL
Measured TD:10210 ft.Measured PB depth:10148 ft.
True Vertical TD:9969 ft.True Vertical PB depth:9907 ft.
Top PZ Location:Sec:8 Twp: 7S 93WFootage: 1436 FNL  2275 FWL
Bottom Hole Location:Sec:8 Twp: 7S 93WFootage: 1455 FNL  2266 FWL
Log Types:RST, CBL and Mud. The attachment LAS.Nuetron (has the RST & CBL).
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 41 ft., Weight: Linepipe , Citings Type: ACTUAL
Cement:Sacks: 4, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1284 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 1284 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10194 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 893, Top: 5280 ft., Bottom: 10194 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6981 ft.10128 ft.
ROLLINS10129 ft.10210 ft.

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 12/14/2010                Interval Top: 8152 ft.    Interval Bottom: 8691 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/16/2010Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/22/2010
Treatment Summary:Stages 6-8 treated with a total of: 55188 bbls of Slickwater, 388000 lbs 20-40 Sand. There are 5 CFP in the well, planned to be drilled out summer of 2011.
Tubing Size:2.375 in.Tubing Setting Depth:8067 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/14/2010Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 970
BBLS_OIL 313
BTU_GAS 1170
CALC_BBLS_H2O 970
CALC_BBLS_OIL 313
CALC_GOR 7077
CALC_MCF_GAS 2215
CASING_PRESS 2450
GRAVITY_OIL 54
MCF_GAS 2215
TUBING_PRESS 1775
Perforation Data:
Interval Top:8152 ft.# Of Holes:81
Interval Bottom:8691 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)408
Total Gas Produced (MCF)73686
GOR180602
GOR DeterminationMCFE
Average BOE per Day35.923
Average MCFE per Day208.346

 Federal Financial Assurance  i 

 Tribal Well  i No