|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/26/2010 Measured TD: 6750 ft. Vertical TD: 6588 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/26/2010 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/2/2012 | | Proposed Top PZ Location: | Sec:17 Twp: 7S 95W | Footage: 1948 FSL 1988 FWL | | Bottom Hole Location: | Sec:17 Twp: 7S 95W | Footage: 1948 FSL 1988 FWL | | Proposed Depth/Form: | 6730 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 440-58 , Unit Acreage: 240, Drill Unit: SW/4 and W/2SE/4 | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-58 , Unit Acreage: 240, Drill Unit: SW/4 and W/2SE/4 | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 60 ft., Weight: 55# , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1000 ft., Weight: 32# , Citings Type: PLANNED | | Cement: | Sacks: 416, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6730 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 750, Top: , Bottom: 6730 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/2/2010 | | Spud Date: | 3/27/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 6750 ft. | Measured PB depth: | 6682 ft. | | True Vertical TD: | 6588 ft. | True Vertical PB depth: | 6520 ft. | | Top PZ Location: | Sec:17 Twp: 7S 95W | Footage: 1924 FSL 2010 FWL | | Bottom Hole Location: | Sec:17 Twp: 7S 95W | Footage: 1923 FSL 2003 FWL | | Log Types: | TRIPLE COMBO, CBL; mud | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 89 ft., Weight: 55 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 89 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2303 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 425, Top: 0 ft., Bottom: 2320 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6729 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 648, Top: 3565 ft., Bottom: 6750 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 3699 ft. | | | | | CAMEO | 6093 ft. | | | | | ROLLINS | 6643 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 7/26/2010 Interval Top: 4843 ft. Interval Bottom: 6587 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/22/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/6/2010 | | Treatment Summary: | Williams Fork-Cameo: Frac wih 56,912 bbls of 2% KCL slickwater and 1,859,400 lbs 20/40 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6153 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/26/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 649 | | BTU_GAS | 1046 | | CALC_BBLS_H2O | 649 | | CALC_MCF_GAS | 2837 | | CASING_PRESS | 1900 | | MCF_GAS | 2837 | | TUBING_PRESS | 1180 |
| | Perforation Data: | | Interval Top: | 4843 ft. | # Of Holes: | 174 | | Interval Bottom: | 6587 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 3477 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.647 |
| Average MCFE per Day | 9.529 |
| Federal Financial Assurance | i | |
|
|