|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2010 Measured TD: 8103 ft. Vertical TD: 7521 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2010 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/26/2010 | | Proposed Top PZ Location: | Sec:35 Twp: 6S 94W | Footage: 2483 FNL 441 FEL | | Bottom Hole Location: | Sec:35 Twp: 6N 94W | Footage: 2483 FNL 441 FEL | | Proposed Depth/Form: | 8299 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-66 , Unit Acreage: 640, Drill Unit: ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1775 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 1775 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8299 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: 8299 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/22/2010 | | Spud Date: | 6/13/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8103 ft. | Measured PB depth: | | | True Vertical TD: | 7521 ft. | True Vertical PB depth: | | | Bottom Hole Location: | Sec:35 Twp: 6S 94W | Footage: 2393 FNL 450 FEL | | Log Types: | SP/GR/HDIL/ZDL/CN AND CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 62 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 23, Top: , Bottom: 62 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1796 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: , Bottom: 1796 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8141 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1405, Top: 2400 ft., Bottom: 8141 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 4485 ft. | | | | | CAMEO | 7240 ft. | | | | | ROLLINS | 8064 ft. | | | | | No formation data to display. |
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 51 |
| Total Gas Produced (MCF) | 30222 |
| GOR | 592588 |
| GOR Determination | MCFE |
| Average BOE per Day | 14.412 |
| Average MCFE per Day | 83.580 |
| Federal Financial Assurance | i | Y |
|
|