Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18722
Well Classification: OW Status: PR - 1/1/2024
Well Name/No:BJU M33 FED #14D-33-496
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC065556
Facility Status:PRStatus Date1/1/2024
FacilityID:413165LocationID:335937
County:GARFIELD #045Location:SWSW 33 4S96W 6
Field:GRAND VALLEY - #31290Elevation:8404 ft.
Basin:PICEANCE BASIN  
Planned Location:760FSL  1240 FWLLat/Long: 39.653357 / -108.178446Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.653357 / -108.178447Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/19/2024
End Date: 1/27/2024
Reported: 2/12/2024
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2024             Measured TD: 11195 ft.    Vertical TD: 11152 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/4/2025
Proposed Top PZ Location:Sec:33 Twp: 4S 96W Footage: 1396 FSL  1117 FWL
Bottom Hole Location:Sec:33 Twp: 4S 96W Footage: 1364 FSL  1028 FWL
Proposed Depth/Form:11182 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit:Big Jimmy Unit Number:COC074105X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 1010, Top: 900 ft., Bottom: 3000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11472 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 1577, Top: 3000 ft., Bottom: 11472 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: 9.625 in., Top: , Depth: 900 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 304, Top: 0 ft., Bottom: 900 ft.

Wellbore Completed
Completion Date:11/7/2023
Spud Date:11/1/2023Spud Date Is:ACTUAL
Measured TD:11195 ft.Measured PB depth:11092 ft.
True Vertical TD:11152 ft.True Vertical PB depth:11049 ft.
Top PZ Location:Sec:33 Twp: 4S 96WFootage: 1411 FSL  1107 FWL
Bottom Hole Location:Sec:33 Twp: 4S 96WFootage: 1371 FSL  988 FWL
Log Types:CBL, PNL (RES in API 045-18719)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: ACTUAL
Cement:Sacks: 1072, Top: 0 ft., Bottom: 3000 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9.625 in., Size: 4.5 in., Top: 0 ft., Depth: 11179 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 1330, Top: 4468 ft., Bottom: 11179 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 900 ft., Bottom: 3000 ft., Sacks: 1072, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.2976 ft.
WASATCH2976 ft.5267 ft.
WASATCH G5267 ft.5674 ft.
FORT UNION5674 ft.7479 ft.
OHIO CREEK7479 ft.7766 ft.
WILLIAMS FORK7766 ft.10347 ft.
CAMEO10347 ft.11015 ft.
ROLLINS11015 ft.11195 ft.

Formation WFOCCM                 Formation Classification:  OW                 Status:  PR - 1/29/2024                 Interval Top: 7487 ft.    Interval Bottom: 10867 ft.

 Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO
1st Production Date:1/29/2024Choke Size: 
Formation Name:WILLIAMS FORK-OHIO CREEK-CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/19/2024Treatment End Date:1/27/2024
Treatment Summary:Frac'd with 269,333 bbls. slickwater and 167 bbls. of 7.5% HCL.
Total fluid used in treatment (bbls):269333Max pressure during treatment (psi):7848
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.41
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):167Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):269333Total flowback volume recovered (bbls):7466
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2024Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 504
BTU_GAS 985
CALC_BBLS_H2O 504
CALC_MCF_GAS 193
CASING_PRESS 490
MCF_GAS 193
Perforation Data:
Interval Top:7487 ft.# Of Holes:396
Interval Bottom:10867 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)671
Total Gas Produced (MCF)368525
GOR549217
GOR DeterminationMCFE
Average BOE per Day176.007
Average MCFE per Day1020.892

 Federal Financial Assurance  i Y

 Tribal Well  i No