|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2025 Measured TD: 9433 ft. Vertical TD: 9263 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/3/2012 | | Proposed Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 2440 FNL 642 FEL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 2460 FNL 660 FEL | | Proposed Depth/Form: | 9435 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-21 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 100 ft., Weight: 53 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: , Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1480, Top: 0 ft., Bottom: 2000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 9435 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 4435 ft., Bottom: 9435 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/8/2011 | | Spud Date: | 2/21/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 9433 ft. | Measured PB depth: | 9356 ft. | | True Vertical TD: | 9263 ft. | True Vertical PB depth: | 9186 ft. | | Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 2449 FNL 637 FEL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 2465 FNL 697 FEL | | Log Types: | PNDL/GR, PND-S CASED HOLE TRIPLE COMBO, CBL/GR | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2411 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 2016, Top: 0 ft., Bottom: 2411 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9390 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 901, Top: 2940 ft., Bottom: 9390 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4539 ft. | | | | | FORT UNION | 4931 ft. | | | | | WILLIAMS FORK | 6164 ft. | | | | | CAMEO | 8729 ft. | | | |
Formation WMFK Formation Classification: GW Status: SI - 7/1/2025 Interval Top: 7455 ft. Interval Bottom: 8916 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 8/1/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/20/2011 | | Treatment Summary: | Frac'd seven stages using 35565 bbls of slickwater gel, 580800 lbs of 30/50 mesh Tejas Gold |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8826 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/30/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 1 | | BTU_GAS | 1090 | | CALC_BBLS_H2O | 26 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 482000 | | CALC_MCF_GAS | 482 | | CASING_PRESS | 950 | | GRAVITY_OIL | 59 | | MCF_GAS | 482 | | TUBING_PRESS | 683 |
| | Perforation Data: | | Interval Top: | 7455 ft. | # Of Holes: | 201 | | Interval Bottom: | 8916 ft. | Hole Size: | 0.3125 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 34 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.017 |
| Average MCFE per Day | 0.094 |
| Federal Financial Assurance | i | |
|
|