|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2016 Measured TD: 9150 ft. Vertical TD: 8875 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2016 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/19/2017 | | Proposed Top PZ Location: | Sec:5 Twp: 7S 94W | Footage: 1162 FSL 520 FEL | | Bottom Hole Location: | Sec:5 Twp: 7S 94W | Footage: 1162 FSL 520 FEL | | Proposed Depth/Form: | 9038 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 139-73 , Unit Acreage: 40, Drill Unit: SESE | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 139-73 , Unit Acreage: 40, Drill Unit: SEC 5 SESE | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-73 , Unit Acreage: 40, Drill Unit: SESE | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 257, Top: 0 ft., Bottom: 1200 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9038 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 940, Top: 4539 ft., Bottom: 9038 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/2/2016 | | Spud Date: | 4/27/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 9150 ft. | Measured PB depth: | 9099 ft. | | True Vertical TD: | 8875 ft. | True Vertical PB depth: | 8824 ft. | | Top PZ Location: | Sec:5 Twp: 7S 94W | Footage: 1133 FSL 532 FEL | | Bottom Hole Location: | Sec:5 Twp: 7S 94W | Footage: 1178 FSL 544 FEL | | Log Types: | PNL, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1214 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 272, Top: 0 ft., Bottom: 1214 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9144 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 839, Top: 3874 ft., Bottom: 9144 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | ALLUVIUM | 0 ft. | 496 ft. | N | N | | WASATCH | 496 ft. | 2896 ft. | N | N | | WASATCH G | 2896 ft. | 3512 ft. | N | N | | FORT UNION | 3512 ft. | 5385 ft. | N | N | | OHIO CREEK | 5385 ft. | 5825 ft. | N | N | | WILLIAMS FORK | 5825 ft. | 8940 ft. | N | N | | ROLLINS | 8940 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: PR - 9/5/2016 Interval Top: 7130 ft. Interval Bottom: 8845 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 9/5/2016 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/1/2016 | Treatment End Date: | 9/4/2016 | | Treatment Summary: | Frac'd with 64,000bbls slickwater and 143bbls of 7.5% HCL acid
| | Total fluid used in treatment (bbls): | 64143 | Max pressure during treatment (psi): | 8348 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 143 | Min frac gradient (psi/ft): | 0.76 | | Recycled water used in treatment (bbls): | 20176 | Total flowback volume recovered (bbls): | 23612 | | Fresh water used in treatment (bbls): | 43824 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8632 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/5/2016 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 812 | | BTU_GAS | 1080 | | CALC_BBLS_H2O | 812 | | CALC_MCF_GAS | 1452 | | CASING_PRESS | 900 | | MCF_GAS | 1452 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 216 | | Interval Bottom: | 8845 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 25 |
| Total Gas Produced (MCF) | 41547 |
| GOR | 1661880 |
| GOR Determination | MCFE |
| Average BOE per Day | 19.694 |
| Average MCFE per Day | 114.239 |
| Federal Financial Assurance | i | |
|
|