|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/16/2011 Measured TD: 6580 ft. Vertical TD: 6411 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/16/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20088148 | Expiration Date: | 2/16/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 732 FSL 1977 FEL | | Bottom Hole Location: | Sec:5 Twp: 7S 95W | Footage: 732 FSL 1977 FEL | | Proposed Depth/Form: | 6611 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-36 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1474 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 1474 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6611 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 11/26/2009 | | Spud Date: | 11/21/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 6580 ft. | Measured PB depth: | 6526 ft. | | True Vertical TD: | 6411 ft. | True Vertical PB depth: | 6357 ft. | | Top PZ Location: | Sec:5 Twp: 7S 95W | Footage: 727 FSL 1948 FEL | | Bottom Hole Location: | Sec:5 Twp: 7S 95W | Footage: 714 FSL 1949 FEL | | Log Types: | MUD LOG, RESERVOIR MONITOR TOOL ELITE, CEMENT BOND LOG | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 24, Top: 0 ft., Bottom: 65 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1206 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1206 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6561 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 845, Top: 2450 ft., Bottom: 2550 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1228 ft. | | N | N | | MESAVERDE | 3428 ft. | | N | N | | CAMEO | 5834 ft. | | N | N | | ROLLINS | 6449 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 2/28/2010 Interval Top: 4710 ft. Interval Bottom: 6367 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/22/2009 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/18/2009 | | Treatment Summary: | 2963 GALS 7 1/2 % HCL; 619100 # 20/40 SAND; 19852 BBLS SLICKWATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6065 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1086 | | CASING_PRESS | 1287 | | MCF_GAS | 944 | | TUBING_PRESS | 1156 |
| | Perforation Data: | | Interval Top: | 4710 ft. | # Of Holes: | 116 | | Interval Bottom: | 6367 ft. | Hole Size: | 0.35 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 2/1/2011 Interval Top: 4710 ft. Interval Bottom: 6367 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 12/22/2009 | Choke Size: | 0.156 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/18/2009 | | Treatment Summary: | 2963 GALS 7.5% HCL; 619100 # 20/40 SAND; 19852 BBLS SLICKWATER (SUMMARY) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6065 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2010 | Test Method: | FLWOING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1086 | | CASING_PRESS | 1287 | | MCF_GAS | 944 | | TUBING_PRESS | 1156 |
| | Perforation Data: | | Interval Top: | 4710 ft. | # Of Holes: | 116 | | Interval Bottom: | 6367 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 23 |
| Total Gas Produced (MCF) | 17673 |
| GOR | 768391 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.411 |
| Average MCFE per Day | 48.800 |
| Federal Financial Assurance | i | |
|
|