|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/28/2010 Measured TD: 7382 ft. Vertical TD: 6409 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/28/2010 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20088145 | Expiration Date: | 2/16/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 312 FSL 636 FWL | | Bottom Hole Location: | Sec:5 Twp: 7S 95W | Footage: 312 FSL 636 FWL | | Proposed Depth/Form: | 7394 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-36 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1608 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 1608 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7394 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 11/6/2009 | | Spud Date: | 11/1/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7382 ft. | Measured PB depth: | 7332 ft. | | True Vertical TD: | 6409 ft. | True Vertical PB depth: | 6359 ft. | | Top PZ Location: | Sec:5 Twp: 7S 95W | Footage: 307 FSL 670 FWL | | Bottom Hole Location: | Sec:5 Twp: 7S 95W | Footage: 299 FSL 675 FWL | | Log Types: | CBL, RESERVOIR MONITOR TOOL ELITE | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 62 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 23, Top: 0 ft., Bottom: 62 ft., Determination Method: | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1612 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1612 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7367 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 830, Top: 3300 ft., Bottom: 7367 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1813 ft. | | N | N | | MESAVERDE | 4160 ft. | | N | N | | CAMEO | 6664 ft. | | N | N | | ROLLINS | 7232 ft. | | N | N |
Formation WFCM Formation Classification: OW Status: PR - 1/1/2025 Interval Top: 5575 ft. Interval Bottom: 7129 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/22/2009 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/18/2009 | | Treatment Summary: | 3513 GALS 7 1/2 % HCL; 742100 # 20/40 SAND; 20880 BBLS SLICKWATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6844 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1068 | | CASING_PRESS | 1653 | | MCF_GAS | 826 | | TUBING_PRESS | 1453 |
| | Perforation Data: | | Interval Top: | 5575 ft. | # Of Holes: | 126 | | Interval Bottom: | 7129 ft. | Hole Size: | 0.35 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 4/16/2011 Interval Top: 5575 ft. Interval Bottom: 7129 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 12/22/2009 | Choke Size: | 0.156 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/18/2009 | | Treatment Summary: | 3513 GALS 7 1/2% HCL; 742100 # 20/40 SAND; 20800 BBLS SLICKWATER (SUMMARY) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6844 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | BTU_GAS | 1068 | | CALC_GOR | 0 | | CASING_PRESS | 1653 | | MCF_GAS | 826 | | TUBING_PRESS | 1453 |
| | Perforation Data: | | Interval Top: | 5575 ft. | # Of Holes: | 126 | | Interval Bottom: | 7129 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 15 |
| Total Gas Produced (MCF) | 11613 |
| GOR | 774200 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.556 |
| Average MCFE per Day | 32.231 |
| Federal Financial Assurance | i | |
|
|