Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18187
Well Classification: GW Status: PR - 2/17/2009
Well Name/No:BATTLEMENT MESA #PA 13-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/17/2009
FacilityID:301578LocationID:334825
County:GARFIELD #045Location:NWSE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5104 ft.
Basin:PICEANCE BASIN  
Planned Location:1811FSL  2325 FELLat/Long: 39.464507 / -108.020263Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.464510 / -108.020258Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/2/2008             Measured TD: 7490 ft.    Vertical TD: 6508 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/2/2008
Wellbore PermitDIRECTIONAL
Permit #:20088156 Expiration Date:2/16/2010
Proposed Top PZ Location:Sec: Twp: Footage: 2184 FSL  184 FWL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 2184 FSL  184 FWL
Proposed Depth/Form:7486 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-36 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:9/5/2009
Spud Date:8/28/2009Spud Date Is:ACTUAL
Measured TD:7490 ft.Measured PB depth:7431 ft.
True Vertical TD:6508 ft.True Vertical PB depth:6449 ft.
Top PZ Location:Sec:5 Twp: 7S 95WFootage: 2174 FSL  162 FWL
Bottom Hole Location:Sec:5 Twp: 7S 95WFootage: 2174 FSL  162 FWL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 62 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 415, Top: 0 ft., Bottom: 1650 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7466 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 2970 ft., Bottom: 7466 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1248 ft.NN
MESAVERDE4105 ft.NN
CAMEO6750 ft.NN
ROLLINS7322 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/31/2010                 Interval Top: 5425 ft.    Interval Bottom: 7166 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/17/2009Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/13/2009
Treatment Summary:3494 GALS 7.5% HCL, 796600# 20/40 SAND, 21293 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6839 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1052
CASING_PRESS 1543
MCF_GAS 903
TUBING_PRESS 1390
Perforation Data:
Interval Top:5425 ft.# Of Holes:125
Interval Bottom:7166 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)22494
GOR775655
GOR DeterminationMCFE
Average BOE per Day10.710
Average MCFE per Day62.105

 Federal Financial Assurance  i 

 Tribal Well  i No