|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/24/2013 Measured TD: 7420 ft. Vertical TD: 7257 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/24/2013 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/10/2013 | | Proposed Top PZ Location: | Sec:9 Twp: 6S 91W | Footage: 513 FSL 670 FWL | | Bottom Hole Location: | Sec:9 Twp: 6S 91W | Footage: 513 FSL 670 FWL | | Proposed Depth/Form: | 7411 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 513-4 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 513-4 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 513-4 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 70 ft., Weight: 65# , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 70 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1332 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 348, Top: 0 ft., Bottom: 1332 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7411 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 726, Top: , Bottom: 7411 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/27/2012 | | Spud Date: | 8/19/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7420 ft. | Measured PB depth: | | | True Vertical TD: | 7257 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:9 Twp: 6s 91w | Footage: 503 FSL 641 FWL | | Bottom Hole Location: | Sec:9 Twp: 6s 91w | Footage: 524 FSL 649 FWL | | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 34, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1374 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 1374 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7401 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1160, Top: 4170 ft., Bottom: 7401 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4490 ft., Depth: 4682 ft., Bottom: 4685 ft., Sacks: 300, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 3435 ft. | | | | | CAMEO | 6904 ft. | | | | | ROLLINS | 7183 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 5/1/2013 Interval Top: 5257 ft. Interval Bottom: 7165 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 2/11/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/20/2013 | Treatment End Date: | 2/12/2013 | | Treatment Summary: | 3000 Gals 7 1/2% HCL; 1277600#30/50, 51700 100-mesh Sand; 35635 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
| | Total fluid used in treatment (bbls): | 35706 | Max pressure during treatment (psi): | 4515 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.56 | | Recycled water used in treatment (bbls): | 35635 | Total flowback volume recovered (bbls): | 11325 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1329300 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6764 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/24/2013 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1173 | | CALC_MCF_GAS | 569 | | CASING_PRESS | 619 | | MCF_GAS | 569 | | TUBING_PRESS | 282 |
| | Perforation Data: | | Interval Top: | 5257 ft. | # Of Holes: | 166 | | Interval Bottom: | 7165 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 45 |
| Total Gas Produced (MCF) | 4969 |
| GOR | 110422 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.469 |
| Average MCFE per Day | 14.324 |
| Federal Financial Assurance | i | |
|
|