Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-18049
Well Classification: GW Status: PR - 2/16/2011
Well Name/No:FEDERAL #PA 44-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date2/16/2011
FacilityID:300850LocationID:335256
County:GARFIELD #045Location:NESW 21 6S95W 6
Field:PARACHUTE - #67350Elevation:5839 ft.
Basin:PICEANCE BASIN  
Planned Location:2353FSL  2196 FWLLat/Long: 39.508953 / -108.005328Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.508952 / -108.005328Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/16/2011             Measured TD: 9180 ft.    Vertical TD: 8395 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/16/2011
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/22/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1255 FSL  258 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 1255 FSL  258 FEL
Proposed Depth/Form:9263 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/13/2009
Spud Date:12/5/2009Spud Date Is:ACTUAL
Measured TD:9180 ft.Measured PB depth:9127 ft.
True Vertical TD:8395 ft.True Vertical PB depth:8342 ft.
Top PZ Location:Sec:21 Twp: 6S 95WFootage: 1267 FSL  277 FEL
Bottom Hole Location:Sec:21 Twp: 6S 95WFootage: 1236 FSL  277 FEL
Log Types:CBL; RESEVOIR MONITOR TOOL ELITE, MUD
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 31, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1090 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1090 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9164 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 938, Top: 4250 ft., Bottom: 9164 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2929 ft.
WASATCH G2929 ft.NN
MESAVERDE5487 ft.
CAMEO8353 ft.
ROLLINS9175 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2010                 Interval Top: 6961 ft.    Interval Bottom: 9062 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/18/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/17/2010
Treatment Summary:4000 GALS 7 1/2% HCL; 1033400# 30/50 SAND; 29785 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8724 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CASING_PRESS 2021
MCF_GAS 1055
TUBING_PRESS 1881
Perforation Data:
Interval Top:6961 ft.# Of Holes:131
Interval Bottom:9062 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)26
Total Gas Produced (MCF)12192
GOR468923
GOR DeterminationMCFE
Average BOE per Day5.831
Average MCFE per Day33.808

 Federal Financial Assurance  i Y

 Tribal Well  i No